Webinar Presentation
Released
Released
Announcement PDF
Delivering
Wave Energy
To The World
Webinar – August 2025
ASX: CCE
OTCQB: CWGYF
WKN: A2DJFY
2025
Who is Carnegie Clean Energy
▪ Technology Developer
▪ Owner of IP including:
• Patents
• Know-how
• Trade secrets (i.e. code, drawings)
▪ Manufacturer of CETO and MoorPower
▪ Service provider for project developers and owners
We harness ocean energy to make the world more sustainable
2
The Problem to Solve
▪ Clean energy is essential for a stable climate
▪ Solar and Wind are highly variable and inconsistent
▪ Community pushback on wind developments is
growing, even solar and batteries
▪ Nuclear is expensive and takes decades to build
▪ Electrification, EVs and datacentres are driving
demand up rapidly
▪ Geopolitical issues with importing energy
3
EU, UK and US are
committing $ for solutions
▪ The European Commission (EC) has set a target of 1 GW installed ocean
energy capacity by 2030 and 40 GW by 2050
▪ This represents up to $5.7bn of capex on ocean energy projects by 2030 in
the EU alone where €195m in funding went toward ocean energy in 2023
▪ Regional governments in the EU such as Spain, France and Portugal are
providing funds in combination with the EU to support ocean energy
Global
Recognition
▪ The US has spent $60m USD on the PacWave test site in Oregon
▪ Funding of $112m USD was committed to advancing wave energy
technologies in the US
▪ The UK is supporting wave energy through a Contracts for Difference
scheme, essentially revenue support
4
Wave energy is special
▪ Waves are concentrated wind energy
▪ Highly consistent and predictable
▪ Vast and untapped resource
▪ Most powerful when needed – Winter
▪ 24/7 power = earns more
▪ Water density 1000x air (wind) density
▪ 5x less area required compared to wind
▪ Ocean space less constrained
5
CETO – The leading solution at scale
A round object under water
Our core technology is
unique and avoids known
issues
Description automatically generated
▪ CETO operates fully submerged,
avoiding issues of visual amenity
and damaging forces from
breaking storm waves
▪ Artificial intelligence helps us
capture more by adapting to
every individual wave that passes
▪ 1 MW capacity leads the industry
Ranked #1
in largest
global
competitive
tender
▪ Direct conversion to electricity
(no hydraulics) delivers flexibility
and efficiency gains
▪ CLICK TO SEE ANIMATION
6 6
Specifications Features
Visual Impact
None – fully submerged
Extreme Wave Survival
Deep diving to 20 m, power production continues
Installation & Recovery
Small tow vessels, diverless and rapid with quick connectors
Maintenance
Swappable WECs at sea and PTOs in port
WEC Rating
1000 kW
Spatial Density
30 MW / km
Capacity factor
30-50%
Operational Wave Range
0.5 - 14 m significant wave height
Water Depth
> 40 m (130 ft). Deeper sites simply require longer ropes
Buoy Diameter
20 m
Buoy Height
4m
2
7
EuropeWave Contracted Deployment
✓ Phase 1 [ COMPLETE ]
✓ Phase 2 [ COMPLETE ]
✓ From initial 36 applicants, Carnegie’s ACHIEVE project ranked
number one at commencement of Phase 3 (€3.75m)
✓ Judged on criteria including LCOE, performance, reliability,
availability and survivability
✓ Deployment at BiMEP after winter with realtime stream of
performance data
✓ Two year of operation
ACHIEVE Project –
Basque Country
Deployment
✓ Carnegie team in Spain (Bilbao) driving the project
Additional National Recognition to Support and Enhance Project
✓ Spanish Government (IDAE - Renmarinas) awarded €1.2m Dec 2023
✓ Basque energy agency EVE awarded €2.1m March 2024
Total funding pool of €7.05m
8
ACHIEVE
Update
Power Take-Off
equipment
supplied
9 9
ACHIEVE
Update
Foundation frame
fabrication & chain
storage at Bermeo Port
10 10
ACHIEVE
Update
Offshore site
preparation
11 11
ACHIEVE Next Steps
◄◄ Deploying large CETO prototype in Spain
▪ Finalise few remaining design tasks
▪ Continue with manufacture of remaining componentry
▪ Integrate using defined assembly processes
▪ Undertake integration tests including “back-to-back”
▪ Transport to port for final assembly and integration
▪ Wet testing alongside wharf at port
▪ Deploy using rapid, diverless process
▪ Operate to prove reliability and performance
12
6 MW Array
▪ MW scale project is the next step in commercialisation
▪ EU support for +60% CAPEX exists
▪ BiMEP supportive with MoU signed in July 2025
▪ Discussions commenced with project participants
▪ Supply Chain developed through ACHIEVE including
agreements with HPE and SKF
13
MoorPower:
Wave Energy for
Aquaculture and
Offshore Demand
Demonstrator Project Complete
✓ Scaled Demonstrator deployed at Carnegie’s
offshore test site in 2024
✓ Operations completed successfully
Commercial Scale Design Underway
✓ Product developed based on requirements
and characteristics of offshore aquaculture
✓ BE CRC funding awarded to complete
preliminary design
Offshore Demand Application Opportunities
✓ Other demand applications for aquaculture
and defence are emerging
14 14
Future revenue sources
▪ Sales of CETO and MoorPower systems
▪ Supply spares and assist with operations
and maintenance
▪ Provide engineering services and
software upgrades
▪ Note:
Carnegie
Business
Model
• Revenues commence up to 4 years
prior to commissioning
• CETO units are estimated to be 75% of
the construction capex
15
Global
Footprint
16
Q&A
Be part of the innovation that will unlock the
power of the world’s oceans
17
Thank you
CEO: Jonathan Fievez
Chairman: Anthony Shields
Carnegie Clean Energy Ltd
Head Office
21 North Mole Drive, North Fremantle
Western Australia 6159
+61 8 6168 8400
Carnegie Technologies Spain
Bilbao, Bizkaia
CETO Wave Energy UK
Edinburgh, Scotland
CETO Wave Energy Ireland
Dublin, Ireland
Carnegie Clean Energy LLC
San Francisco, USA
carnegiece.com
18
Share your feedback
Discover