Appendix 4E & 2025 Financial Report
Released
Released
Announcement PDF
APPENDIX 4E
Preliminary Financial Report to the Australian Securities Exchange
Name of Entity
ABN
Financial Year Ended
Previous Corresponding Reporting Period
Carnegie Clean Energy Limited
69 009 237 736
30 June 2025
30 June 2024
Results for Announcement to the Market
$
Percentage increase
/ (decrease) over
previous
corresponding
period
(9.4%)
0.3%
Revenue from Ordinary activities
405,371
Profit / (loss) from ordinary activities after tax
(2,327,734)
attributable to members
Net profit / (loss) for the period attributable to
(2,327,734)
0.3%
members
Dividends (distributions)
Amount per security
Franked amount per security
Final Dividend
Nil
n/a
Interim Dividend
Nil
n/a
Record date for determining entitlements to
n/a
the dividends (if any)
Brief explanation of any of the figures reported above necessary to enable the figures to be
understood:
Net loss from ordinary activities was $2,327,734.
The Directors do not intend to declare a dividend as no profit was made during the year ended 30
June 2025. No dividends were paid during the financial year.
Dividends
Date the dividend is payable
Record date to determine entitlement to the
dividend
Amount per security
Total Dividend
Amount per security of foreign sourced
dividend or distribution
Details of any dividend reinvestment plans in
operation
The last date for receipt of an election notice
for participation in any dividend reinvestment
plans
n/a
n/a
n/a
Nil
n/a
None
n/a
Net Tangible Asset Backing
Current Period
Previous Corresponding
Period
0.41 cent
1.54 cent
Net tangible asset backing per ordinary
security (cents per share)
Other Significant Information Needed by an Investor to Make an Informed
Assessment of the Entity’s Financial Performance and Financial Position
The carrying value of the CETO intellectual property is tested periodically or when there is a
significant change in the model, by an independent accounting firm. For the financial year 2025,
the CETO Intellectual Property valuation methodology continues to use a ‘relief from royalty’
method. There was an increase in the carrying value of the CETO IP from $15.5 million to $17.7
million during the year, this is due to work on ACHIEVE Programme but this has been offset by
receiving 2024 financial year R&D tax refund and grant income.
Commentary on the Results for the Period
The earnings per security and the nature of any dilution aspects:
During the year, 9,600,00 unlisted employee options were issued under an Employee Incentive Plan
and 50,000,000 unlisted options were issued as a fee for the arrangement of the $2.5m loan facility.
Further details about the Company’s performance can be found in the below Discussion of trends in
performance.
Returns to shareholders including distributions and buy backs:
n/a
Significant features of operating performance:
n/a
The results of segments that are significant to an understanding of the business as a whole:
The segment losses after tax for the year were:
($2,327,734) loss for the continuing operations.
Discussion of trends in performance:
During the financial year, Carnegie progressed its wave energy products in line with the Product
Validation Roadmap for core CETO and MoorPower technologies. The validation of our products in
real operating environments is an important stage in their commercialisation pathways.
Carnegie has made strong progress to validate its core CETO and MoorPower technologies through
delivery of projects that have support from key partners and funders. CETO Wave Energy Ireland’s
contract through the EuropeWave PCP Programme, Carnegie Technologies Spain’s RENMARINAS
DEMOS grant and Basque Energy Agency (EVE) grant, and Carnegie’s MoorPower Projects are key
mechanisms being utilised to validate the technologies. These activities are supported by the
Company’s strong partner ecosystem, which includes Hewlett Packard Enterprise and Blue Economy
Cooperative Research Centre (BE CRC).
2
During the year the Company made significant strides on CETO, Carnegie’s core technology, a
submerged point absorber type wave energy converter which converts ocean waves into zeroemission electricity. The commercialisation of Carnegie’s CETO technology has been driven through
the ACHIEVE Programme, which represents Carnegie's first deployment of CETO in Europe at the
Biscay Marine Energy Platform (BiMEP) test site in the Basque Country. Key activities for the ACHIEVE
Programme during the year have included progress in design, fabrication, manufacturing, site
preparation, and sub-system testing with support from a developing European supply chain.
Additional product development can be seen in new partnerships such as with SKF on the CETO
power take-off system and with Chugachmiut to explore the development of CETO projects in the
Chugach Region of Southcentral Alaska. Subsequent to the end of the year, Carnegie announced the
development of a 6 MW CETO array project to follow on from ACHIEVE at BiMEP.
The other core product focus during the year was MoorPower, a CETO derived wave energy product
designed to deliver a sustainable energy supply for marine industries operating at a fixed moored
location, reducing the reliance on diesel. The initial target market is Aquaculture. During the year,
the Company completed operations of the MoorPower Scaled Demonstrator at our offshore test site
in North Fremantle, WA. These activities were delivered with support from partners including the
Blue Economy CRC and Aquaculture partners Huon and Tassal. Operations delivered significant data,
validated the functional design and validated the numerical modelling capabilities which allow the
team to accurately forecast the performance of future commercial scale systems. Building on lessons
from the Scaled Demonstrator, the team also started working towards securing the first Commercial
Pilot with an operating aquaculture facility. In June 2025, the Company was awarded a grant from
the BE CRC to support the preliminary design of the MoorPower Commercial Pilot Project, bringing
the technology closer to its first commercial application.
The Garden Island Microgrid continues to operate and sell power to the Department of Defence under
an existing Electricity Supply Agreement. Some operational and equipment issues currently constrain
the output of the system. However, the team continues to work to resolve these issues.
Globally, there is growing recognition of the need for climate change solutions. Renewables are a
key part of the energy transition required and there is a significant opportunity for offshore
renewables to play a larger part in a diverse renewable energy portfolio. Full decarbonisation is
essential to meet global targets and Carnegie’s technologies are applicable to many hard-to-abate
markets. International support for wave energy continues increasing and new funding opportunities
are emerging, particularly in Europe.
Entities purchased/sold during the last financial year
Name of Entity
Carnegie Clean Energy LLC
Date Control Gain/Lost
October 4, 2024
Details
Incorporation of a new wholly owned
subsidiary in the USA
Investments in Associates and Joint Ventures
Name
% Holding
Contribution to Profits / (Loss)
2025
2024
Audit/Review Status
3
This report is based on accounts to which one of the following applies: (Mark with “YES” or
“NO”)
The accounts have been audited
Yes
The accounts have been subject to
No
review
The accounts are in the process of being No
The accounts have not yet been
No
audited or subject to review
audited or reviewed
This report is based on financial accounts for the year ended 30 June 2025 which have been
audited. There are no disputes or qualification to the financial accounts that the Board is aware of.
If the accounts have not yet been audited or subject to review and are likely to be subject to
dispute or qualification, a description of the likely dispute or qualification:
n/a
If the accounts have been audited or subject to review and are subject to dispute or
qualification, a description of the dispute or qualification:
n/a
Attachments forming part of Appendix 4E
Attachment Details
#
1
Financial Report for the year ended 30 June 2025 (audited)
Print name:
Date:
Jonathan Fievez
Chief Executive Officer
22 August 2025
4
CARNEGIE CLEAN ENERGY LIMITED
ABN 69 009 237 736
AND CONTROLLED ENTITIES
FINANCIAL REPORT
FOR THE YEAR ENDED
30 JUNE 2025
1
CARNEGIE CLEAN ENERGY LIMITED
ABN 69 009 237 736
AND CONTROLLED ENTITIES
CONTENTS
Page No.
_________________________________________________________________________________________
DIRECTORS' REPORT ........................................................................................................ 3
AUDITOR’S INDEPENDENCE DECLARATION .... ……………………….…...……………14
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER
COMPREHENSIVE INCOME ............................................................................................. 15
CONSOLIDATED STATEMENT OF FINANCIAL POSITION............................................ 16
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY............................................ 17
CONSOLIDATED STATEMENT OF CASH FLOWS ......................................................... 18
NOTES TO THE FINANCIAL STATEMENTS .................................................................... 19
CONSOLIDATED ENTITY DISCLOSURE STATEMENT ................................................. 39
DIRECTORS' DECLARATION ........................................................................................... 40
INDEPENDENT AUDITOR’S REPORT………………………………………………….……41
2
CARNEGIE CLEAN ENERGY LIMITED
ABN 69 009 237 736
AND CONTROLLED ENTITIES
DIRECTORS' REPORT
30 JUNE 2025
The Directors present their report on Carnegie Clean Energy Limited ("the Company", or “Carnegie”) and its
controlled entities, ("the Group") for the financial year ended 30 June 2025.
DIRECTORS
The Directors of the Company in office at any time during or since the end of the financial year are:
Anthony Shields B.Bus (Chairman from 4 February 2025, was Non-Executive Director) - appointed 25
November 2019
Mr Shields is the Managing Director of Asymmetric Investment Management Fund Pty Ltd (Asymmetric), a
Perth-based investment manager specialising in private debt, venture capital and risk management. He also
sits on a number of other non-listed company boards both in Executive and Non-Executive capacities
(Asymmetric Investment Management, Source Certain International, NWQ Capital and Old Perth Port). Prior to
Asymmetric, Mr Shields established and managed an investment portfolio for a family office in Perth, Western
Australia. He currently sits on the investment committee of Canci Group advising on investment strategy and
portfolio management. Prior to his family investment roles, Mr Shields worked for Deutsche Bank in equity and
derivatives sales and trading, and for Macquarie Bank as an equity analyst and in institutional equity sales and
trading.
Mr Shields has not been a director of any other listed Company in the last three years.
Michael Fitzpatrick AO B.Eng (Hons), B.A (Hons), M.A (Oxon) (Non-Executive Director) – appointed 28
November 2012
Committed to sustainability, Mr Fitzpatrick is a pioneer in renewable investments, including investing in Pacific
Hydro, developer of the first commercial windfarm in Australia in the 1990s and the Ord Hydro-Electric Scheme.
He founded the infrastructure investment firm, Hastings Funds Management Limited, managing investments of
over $3.8 billion.
Mr Fitzpatrick is an Alternative Director of Foresight Australia Limited (previously Infrastructure Capital Group),
manager of Australian Infrastructure Fund Limited, a billion dollar renewables fund owning wind, solar and hydro
assets.
He was a former Director of Rio Tinto Limited and Chairman of the Australian Football League.
Mr Fitzpatrick is the Chairman and Director of LATAM Autos Limited which was a listed company until 8 May
2020.
Grant Mooney B.Bus, CA (Non-executive Director and Company Secretary) – appointed 19 February 2008
Mr Mooney is the principal of Perth-based corporate advisory firm Mooney & Partners, specialising in corporate
compliance administration to public companies. Mr Mooney has gained extensive experience in the areas of
corporate and project management since commencing Mooney & Partners in 1999. His experience extends to
advice on capital raisings, mergers and acquisitions and corporate governance. Currently, Mr Mooney serves
as a Director to several ASX listed companies across a variety of industries including technology and resources.
He is a Director of Gibb River Diamonds Limited, appointed 14 October 2008, Accelerate Resources Limited,
appointed 1 July 2017, Talga Group Limited, appointed 20 February 2014, Aurora Labs Limited appointed 25
March 2020 and CGN Resources Limited appointed 1 July 2023 and Riedel Resources Limited appointed 31
October 2018. He was a previous Director of Greenstone Resources Limited (formerly Barra Resources
Limited), until his resignation on 18 August 2021, SRJ Technologies Limited until his resignation on 17 January
2023 and Riedel Resources Limited until his resignation on 7 April 2025 . Mr Mooney is also a member of
Chartered Accountants Australia and New Zealand.
3
CARNEGIE CLEAN ENERGY LIMITED
ABN 69 009 237 736
AND CONTROLLED ENTITIES
DIRECTORS' REPORT
30 JUNE 2025
Terry Stinson B.Bus Admin (Magnum Cum Laude) (Chairman) – appointed 15 November 2017, retired 4
February 2025
Mr Stinson has over 30 years of executive leadership and non-executive director experience with innovation
companies globally. He was formerly the Chief Executive Officer and Managing Director of Orbital Corporation
Ltd, until his resignation as a director on 18 November 2019. He was a former Vice President and General
Manager at Siemens AG, Chief Executive Officer and Managing Director at Synerject, Vice President at
Manufacturing Outboard Marine Corporation, and Director Advanced Product and Process Development at
Mercury Marine, a division of Brunswick Corp.
Mr Stinson is currently a Non-Executive Chair Talga Group Ltd, appointed February 9, 2017, and Engentus Pty
Ltd, appointed April, 2021. Mr Stinson was a Non-Executive Director of Aurora Labs, appointed 26 February
2020 until his resignation on 31 July 2025.
At the date of this report, the direct and indirect interests of the Directors in the shares and options of the Company
were:
ORDINARY
OPTIONS
SHARES
Terry Stinson (retired 4 February 2025) (i)
644,000
Michael Fitzpatrick (ii)
20,430,709
Grant Mooney (iii)
7,000,000
Anthony Shields (iv)
15,539,710
i.
ii.
iii.
iv.
Mr Stinson has an interest in 644,000 ordinary shares which are held by Terry Stinson <Stinson Family
Trust>.
Mr Fitzpatrick is a Director of Log Creek Pty Ltd and therefore is deemed to have an interest in 20,430,709
ordinary shares held by Log Creek Pty Ltd.
Mr Mooney is a Director of Ocean Flyers Pty Ltd and is therefore deemed to have an interest in 2,000,000
ordinary shares. Mr Mooney also holds 5,000,000 ordinary shares in his own name.
Mr Shields is a Director of Asymmetric Credit Partners Pty Ltd and therefore is deemed to have an interest
in 15,539,710 ordinary shares and 50,000,000 options held by Asymmetric Credit Partners Pty Ltd.
COMPANY SECRETARY
Mr Grant Mooney held the position of company secretary during the financial year and to the date of this report.
Mr Mooney is the principal of Perth-based corporate advisory firm Mooney & Partners, specialising in corporate
compliance administration to public companies. Mr Mooney has gained extensive experience as a Company
Secretary over many years.
PRINCIPAL ACTIVITIES
The principal activity of the Group during the year was the development of the CETO Wave Energy Technology.
OPERATING RESULTS
The net loss the Group for the financial year ended 30 June 2025 was $2,327,734 (2024: loss of $2,320,225).
DIVIDENDS
The Directors do not recommend the payment of a dividend for the financial year ended 30 June 2025. No
dividends were paid during the financial year.
4
CARNEGIE CLEAN ENERGY LIMITED
ABN 69 009 237 736
AND CONTROLLED ENTITIES
DIRECTORS' REPORT
30 JUNE 2025
REVIEW OF OPERATIONS
During the year ended 30 June 2025, the Group’s activities included the following:
Product Development
Carnegie and its subsidiaries have secured and are delivering several project contracts which are supporting
the Company’s core product development activities.
CETO: Carnegie’s core wave energy technology, a submerged point absorber type wave energy converter
which converts ocean waves into zero-emission electricity.
The commercialisation of Carnegie’s CETO technology has been driven through the ACHIEVE
Programme, which represents Carnegie's first deployment of CETO in Europe at the Biscay Marine
Energy Platform (BiMEP) test site in the Basque Country. Key activities for the programme have
included progress in design, fabrication, manufacturing, site preparation, and sub-system testing with
support from a developing European supply chain.
Throughout the year, Carnegie has unlocked milestone payments for the ACHIEVE Programme
totalling €2.1m (AUD $3.6m). This includes € 591k (approx. $980K AUD) from the EuropeWave PCP
Programme, €1.2m (approx. $2.1m AUD) from RenMarinas and €318k (approx. $545K AUD) from Ente
Vasco de la Energia (EVE). These milestone payments have been received following delivery of project
milestones including in relation to design, procurement and testing of key equipment.
Carnegie partnered with SKF, a global industrial leader in bearings and seals, to collaborate on the
Power Take-Off (PTO) system for CETO. The partnership builds on SKF's experience in other EUfunded ocean energy projects and marks their strategic move into wave energy applications. SKF will
undertake comprehensive testing of the PTO units at the SKF Schweinfurt facility upon the completion
of their manufacturing and assembly.
Carnegie has signed a two-year contract with BiMEP to install and test CETO under the ACHIEVE
Programme. The agreement gives Carnegie access to BiMEP's offshore and onshore infrastructure,
including mooring areas and electrical connections, enabling CETO to supply electricity to the grid.
Pre-deployment activities commenced at the BiMEP site to ensure the berth is prepared for the
ACHIEVE CETO deployment. These activities have included BiMEP undertaking essential site works
to remove historical equipment and the subsequent deployment of new Sofar Ocean wave buoys, which
provide valuable data and support knowledge about real-time site conditions.
In May 2025, Carnegie signed a Memorandum of Understanding (MOU) with Chugachmiut to explore
the development of CETO projects in the Chugach Region of Southcentral Alaska. Chugachmiut, which
serves seven Native tribes in the region, is exploring the potential for wave energy to provide clean,
affordable, and reliable electricity. Carnegie and Chugachmiut will explore the technical and commercial
pathways for CETO deployment, including potential activities such as wave buoy deployments, local
infrastructure review, and securing project funding.
Carnegie extended its collaboration with Hewlett Packard Enterprise (HPE) for an additional two years,
continuing a partnership that began in 2020 and is now set to run until 2026. This ongoing collaboration
is focused on implementing reinforcement learning control for CETO.
Subsequent to year end, Carnegie announced the development of a 6MW CETO array project in
Europe, a key next step on CETO’s commercialisation pathway. The Company signed a non-binding
MoU with BiMEP as the potential site. The choice of location in the Basque Country leverages the local
team and knowledge that has developed through the ACHIEVE Programme.
5
CARNEGIE CLEAN ENERGY LIMITED
ABN 69 009 237 736
AND CONTROLLED ENTITIES
DIRECTORS' REPORT
30 JUNE 2025
REVIEW OF OPERATIONS (CONTINUED)
MoorPower: Designed to provide a sustainable alternative to diesel, MoorPower is a CETO-derived wave
energy solution that supplies clean energy to marine industries operating at a fixed moored location. During
the year, the Company worked on the MoorPower Scaled Demonstrator and Commercial Pilot Projects.
MoorPower Scaled Demonstrator: The first step on the MoorPower commercialisation pathway was the
deployment of three scaled MoorPower modules on a barge to validate the technology. The team
delivered the design, manufacture, onshore assembly and offshore testing of the demonstrator as part
of the $3.4 million MoorPower Scaled Demonstrator Project. The Project was supported by the Blue
Economy CRC (BE CRC) and delivered in collaboration with partners including Huon and Tassal.
o
o
The MoorPower Scaled Demonstrator was deployed in January 2024 at Carnegie's offshore test
site in Western Australia. The system was retrieved in late 2024, marking the completion of its
operational phase. Final payment from the BE CRC was received in early 2025.
The Demonstrator proved the system’s functional performance and was successfully validated
against Carnegie’s numerical models. Over 2,000 hours of operational data were collected and
analysed. The Demonstrator's performance validated the potential for a commercial MoorPower
system to produce at least 50% of the annual energy demand for an aquaculture barge.
MoorPower Commercial Pilot: To advance the commercialisation of MoorPower, a MoorPower
Commercial Pilot Preliminary Design project was announced in June 2025. This project, with a total
value of $752,020, is supported by $335,020 in cash funding from the BE CRC and an in-kind
contribution of $417,000 from project partners. The project builds on the successful MoorPower Scaled
Demonstrator Project, using learnings and validated models to advance the commercial design.
o
o
The Preliminary Design Project is focused on scaling and optimising the MoorPower system for a
commercial pilot deployment. It involves a detailed assessment of aquaculture's operational
requirements and a study of feed barge configurations and mooring systems.
The Preliminary Design will provide the technical foundation and specifications required to unlock
investment for a full-scale MoorPower Commercial Pilot project. This is an important step towards
integrating MoorPower units onto a working feed barge to showcase the technology's capabilities.
Mooring Tensioner: A component which provides passive tension required for rotary electric power take-off
systems, such as is required for CETO and MoorPower. Prior to the start of the year, Carnegie had completed
the manufacture and commenced testing of the Mooring Tensioner via the MoTWEC (Mooring Tensioner for
the Wave Energy Converters) Project, supported by the BE CRC and delivered in collaboration with partners.
During the year, the components were tested at Carnegie’s onshore test facility in Western Australia.
The testing protocol involved simulation of over 6.5 years of operational testing. The Project was
successfully completed in late 2024 with the final payment from BE CRC received in early 2025.
The Tensioner technology, including lessons learned from the MoTWEC project, are integrated into both
the CETO and MoorPower commercial designs. Additional demonstration of the Tensioner technology
is delivered through the incorporation of tensioners in both the completed MoorPower Scaled
Demonstrator Project, and the upcoming deployment of CETO through the ACHIEVE Programme.
Garden Island Microgrid
All power generated by the Garden Island Microgrid is sold to the Department of Defence through a
direct Power Supply Agreement. This agreement ensures a secure and consistent purchase of all
electricity produced by the microgrid, establishing a stable revenue stream for the Company.
6
CARNEGIE CLEAN ENERGY LIMITED
ABN 69 009 237 736
AND CONTROLLED ENTITIES
DIRECTORS' REPORT
30 JUNE 2025
REVIEW OF OPERATIONS (CONTINUED)
Corporate
To provide upfront cashflow support for the ACHIEVE Programme, Carnegie secured a $2.5 million
loan in October 2024. This loan addresses the timing difference between ACHIEVE project expenditure
and receipt of retrospective milestone payments. The loan will be repaid from future milestone payments
and tax incentives.
In late 2024, Carnegie secured an Export Growth Bond Facility with Export Finance Australia (EFA) to
provide support for the ACHIEVE Programme. The facility provides advanced payment guarantee
bonds which enable Carnegie to access grant funding from the Spanish Government and the Basque
Government in advance of project completion. The total bond facility limit is approximately €2.5 million.
Recognising the growing market opportunity in the United States, Carnegie established a US
subsidiary, Carnegie Clean Energy LLC. The US is a key market due to its significant wave energy
resource and support for the ocean energy industry through investment in research, development, and
deployment. The new subsidiary is strategically positioned to explore and pursue these opportunities.
On 5 February 2025, Terry Stinson, who had served as Non-Executive Chairman since 2017, retired
from his role as both Chairman and Director. Anthony Shields, a Non-Executive Director, was appointed
to succeed him as Non-Executive Chairman.
In March 2025, Carnegie changed its share registry provider to XCEND Pty Ltd.
The Company’s Annual General Meeting (AGM) was held on November 19, 2024. All resolutions were
passed.
FINANCIAL POSITION
The net assets of the Group decreased by $1,860,877 (2024: decreased by $126,064) from $21.10 million to
$19.24 million as at 30 June 2025. This is predominantly the result of the net loss for the period offset by the $2.5
million of loans.
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
There has been no other significant change in the state of affairs of the Group to the date of this report.
SIGNIFICANT EVENTS SUBSEQUENT TO YEAR END
On 12 August 2025, the Company announced a $3 million share purchase plan at 5.7 cents per share. The offer
opens 15 August 2025 and closes on 8 September 2025.
Other than the above, there has not been any matter or circumstance that has arisen after balance date that has
significantly affected, or may significantly affect, the operations of the Group, the results of those operations, or
the state of affairs of the Group in future financial periods.
FUTURE DEVELOPMENTS, PROSPECTS AND BUSINESS STRATEGIES
Strategy
As a technology developer, the Company is focused on the commercialisation of its core wave energy products,
the CETO and MoorPower technologies. In the interest of astute capital management, Carnegie has looked for,
and found, programmes and organisations to financially support these developments.
For CETO, the strategy has been to secure support via the EuropeWave programme (€3.75m), Spanish
Government (€1.2m) and Basque Government (€2.1m) to deliver the Company’s first CETO deployment in
Europe through the ACHIEVE Programme. Europe is the most attractive jurisdiction for wave energy deployments
currently given the targets set by the EU and the support on offer.
As Carnegie’s EuropeWave bid was ranked first amongst the three finalists selected, the Company had the first
choice of the deployment sites on offer. Carnegie selected the Biscay Marine Energy Platform (BiMEP) an offshore
test site in the Basque Country, Spain. During the year, the contracts were finalised for the use of the site and the
Company is progressing towards deployment.
7
CARNEGIE CLEAN ENERGY LIMITED
ABN 69 009 237 736
AND CONTROLLED ENTITIES
DIRECTORS' REPORT
30 JUNE 2025
FUTURE DEVELOPMENTS, PROSPECTS AND BUSINESS STRATEGIES (CONTINUED)
Strategy (continued)
The strategy going forward is to use the European deployment of CETO through the ACHIEVE Programme to
attract a partner to drive development of future projects, including a first array project. This is reflected in the
announcement subsequent to the year end, of the development of a 6 MW CETO array project at BiMEP which
is planned to follow on from ACHIEVE. Importantly, being awarded top ratings in the EuropeWave programme
also provides 3rd party assessment of the technology and the Company, crucial inputs to the investment
decisions of future project partners.
For MoorPower, the strategy has also been to demonstrate the technology in order to build confidence with
potential customers. This is why the Company, with the support of the Blue Economy CRC, operated a scaled
demonstration of the MoorPower system on a barge during the year.
The MoorPower Scaled Demonstrator project successfully validated the design and numerical models and the
project completed during the year. Subsequently, the team secured additional funding from the Blue Economy
CRC to deliver the preliminary design of the next phase of the MoorPower technology roadmap, a commercial
prototype on an operating barge. This involves working with project partners, Huon and Tassal, together with
the Blue Economy CRC to form the project that will see the MoorPower system at commercial scale installed
on a working feed barge.
Risks
The need for renewable energy is only increasing. Governments are progressively recognising the growing risk
that climate change and other related pollutants pose to health and security. There are various mechanisms in
place in the major markets of the USA and Europe that support the energy transition with specific elements that
focus on the emerging field of ocean energy. Whilst this support is currently growing, risks are present due the
reluctance of governments and agencies to take a long term view in the face of the worsening crisis.
Technologies that are mature may potentially take a larger share of the support available as they are deployable
at scale today.
At the project level, risks are present for CETO (and the future planned commercial MoorPower prototype) with
finalising the design and securing supply of critical components. While the