ACHIEVE Programme Update
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
30 APRIL 2026
www.carnegiece.com
1
ACHIEVE Programme Update
Carnegie Clean Energy (ASX: CCE) (“Carnegie” or the “Company”) is pleased to provide an update on
activities underway as part of the ACHIEVE Programme, which will deploy and operate a scaled CETO
unit at the Biscay Marine Energy Platform (BiMEP). Following the progress made in 2025, the ACHIEVE
team has successfully transitioned several key workstreams from procurement into the final stages of
fabrication, assembly and testing as the project moves towards the planned deployment,
commissioning and grid connection later this year.
Work completed in recent months has focused on the fabrication, manufacture, assembly, integration
and testing of components and sub-systems of the ACHIEVE CETO unit. In addition, the team has been
preparing for upcoming testing activities including full power take-off system testing and engaging
with deployment contractors for offshore operations. In parallel, the Company continue engaging with
Project stakeholders across the Basque Country and broader industry stakeholders across Europe in
relation to the CETO commercialisation pathway.
Carnegie’s CETO unit indicating key sub-components
Fabrication, Manufacture and Assembly
In collaboration with supply chain partners, fabrication and manufacture of many key components has
been completed, with the final component fabrication work packages underway. As examples of work
over recent months, the team has taken delivery of off the shelf components including the dynamic
cable and export cable connector — alongside the completed manufacturing of specialised
equipment, including primary mooring connectors. Fabrication of structural elements, such as the
Electrical Module and bespoke metal equipment including the drums and sheaves has also been
completed.
www.carnegiece.com
2
CETO Electrical Module (top left to bottom right): fabrication, coating, fit out and inspection
Following the fabrication and coating of the Electrical Module (EM) frame, the fit out of the EM is now
complete, with all previously tested control and electrical systems assembled and installed in situ. The
EM acts as the "brain" of the CETO unit and contains critical communications tools that will be utilised
during deployment. It also contains elements such as the cooling system which has been tested to
ensure thermal management for these high-performance electronics.
Key metal elements of the power take-off system such as the main drum, sheaves, and tensioner
metallic elements have been manufactured successfully using local Basque suppliers.
Main Drum Manufacture
www.carnegiece.com
3
Final fabrication work is being undertaken on the Power Take-Off (PTO) Module frames. The three
PTO Modules serve as the "powerhouse" of the CETO unit, and contain the generators, drums, and
belt systems that produce the onboard electricity for export back to shore. Once the module
fabrication is complete, they will be fitted with their internal components and undergo a final testing
regime before being integrated into the Buoyant Actuator (BA) and deployed.
Manufacture of Power Take-Off Modules
Additional equipment nearing completion includes elements such the quick connector developed with
Quoceant Ltd. This component is a key enabler of CETO’s "plug-and-play" strategy, allowing for more
efficient offshore operations through diverless deployment.
The mooring tensioner units are also nearing completion, with the first batch of composite elements
ready for assembly ahead of upcoming system testing. As a critical component of the PTO, the
tensioner provides passive tension to the system, acting as a mechanical battery to store and release
energy.
Component and sub-system onshore testing
The ACHIEVE CETO Unit is being subjected to a range of onshore testing campaigns at component,
sub-system and system levels, in order to deliver valuable learnings and validation in controlled
environments before the first deployment offshore.
Many of the components procured for the ACHIEVE CETO unit had undergone commissioning tests by
the supplier before being delivered to Carnegie last year. Over recent months, functional testing has
been completed on bespoke components such as the primary mooring connector.
The electrical and control systems have undergone multiple testing campaigns including sub-system
tests and full integration tests following Electrical Module fit-out. The team has also concluded the
Control System Hardware-in-the-Loop (HIL) testing, allowing the control software to be validated
against simulated extreme sea states using the actual control hardware. The electrical and control
testing has been completed ahead of the back-to-back PTO test campaign which will utilise the
completed Electrical Module.
www.carnegiece.com
4
Integration testing of the electrical, control and cooling system prior to installation in the Electrical Module
Mechanical system testing has also been undertaken, for example with belt testing undertaken last
year and with testing underway for the belt terminations and initial tracking of the self-aligning
sheave. Validating the sheave design through testing is a valuable task, as the sheave is a key
component designed to keep the belt centred under high tension, a critical interface for CETO’s power
generation.
In the coming months, the team will undertake final back-to-back PTO testing regime of PTO Modules
at SKF in Germany before all the Modules are integrated into the BA in the Basque Country, ready for
deployment.
CEO Jonathan Fievez at SKF in April inspecting testing facilities (left) and assembly progress (right)
Delivering ACHIEVE’s rigorous testing regime is important to ensure the mechanical and electrical
systems are validated against modelling and ready for final integration and deployment of the
ACHIEVE CETO unit. Ultimately, all of the lessons learned through onshore and offshore testing will
deliver significant value to the commercialisation pathway of the CETO technology.
www.carnegiece.com
5
Stakeholder engagement across the Basque Country
Active engagement with local and international stakeholders remains a priority to ensure strategic
alignment as the ACHIEVE Programme matures. Carnegie recently hosted students at its Basque office
as part of the Egin eta Ekin programme, an initiative designed to foster an entrepreneurial culture and
inspire the next generation of wave energy professionals.
Carnegie Technologies Spain team present at industry and stakeholder events across the Basque Country
Furthering regional cooperation, CTO Alexandre Pichard presented at the "Perspectives for
Development and Cooperation in Offshore Renewable Energy" event in Bayonne, France. This session
highlighted the growing energy hub between Nouvelle-Aquitaine and Euskadi, emphasising the
importance of regional supply chains and world-class testing facilities like BiMEP.
View and engage with this announcement on Carnegie’s dedicated Investor Hub:
https://investors.carnegiece.com/link/PKN3Vr
This announcement has been authorised by the Chairman and CEO.
For more information
Carnegie Clean Energy Limited
+61 8 6168 8400
enquiries@carnegiece.com
www.carnegiece.com
www.carnegiece.com
6
ABOUT CARNEGIE AND ITS SUBSIDIARIES
Carnegie Clean Energy (ASX: CCE) is a technology developer focused on delivering ocean energy
technologies to make the world more sustainable. Carnegie Technologies Spain and CETO Wave
Energy Ireland are wholly owned subsidiaries of Carnegie Clean Energy. Carnegie is the owner and
developer of the CETO® and MoorPower® technologies, which capture energy from ocean waves and
convert it into electricity. Using the latest advances in artificial intelligence and electric machines,
Carnegie optimally controls our technologies and generates electricity in the most efficient way
possible. The company has a long history in ocean energy with a track record of world leading
developments. https://www.carnegiece.com
ABOUT ACHIEVE PROGRAMME
The ACHIEVE Programme is an initiative being
delivered by Carnegie’s subsidiaries CETO Wave
Energy Ireland under contract by EuropeWave Buyers
Group (ACHIEVE Project) and Carnegie Technologies
Spain with the support of funding awarded by the
Spanish Government through the RENMARINAS
Demos Programme (AGUAMARINA Project) and the
Basque Government through a grant from the Ente
Vasco de la Energia (ACHIEVE+ Project).
Through this collaborative initiative, Carnegie will
deploy and operate a CETO prototype at the Basque
Marine Energy Platform (BiMEP) in the Basque
Country, Spain, marking a key step on CETO’s
commercialisation pathway. The CETO Unit will operate at this open ocean site and the data collected
will be used to validate the performance of the CETO technology and propel it along the
commercialisation pathway.
ABOUT EUROPEWAVE
EuropeWave PCP is an innovative R&D programme for wave
energy technology, which runs from 2022 to 2026. It combines
over €22.5m of national, regional and EU funding to drive a
competitive Pre-Commercial Procurement (PCP) programme
for wave energy.
Originally pioneered by the Wave Energy Scotland programme, the PCP model provides a structured
approach, fostering greater openness, collaboration and sharing of risk between the public sector and
technology developers. The programme will focus on the design, development, and demonstration of
www.carnegiece.com
7
cost-effective wave energy converter (WEC) systems for electrical power production that can survive
in the harsh ocean environment.
Match-funded by the EU’s Horizon 2020 programme, EuropeWave is a collaboration between Wave
Energy Scotland (WES), the Basque Energy Agency (EVE) and Ocean Energy Europe (OEE). This
collaboration is closely aligned with the decarbonisation, industrial and competitiveness objectives of
the European Green Deal, and is part of a range of actions being taken to meet the European
Commission’s targets of 100MW of ocean energy by 2027 and at least 1GW by 2030.
The EuropeWave Project has received funding from the European Union’s Horizon
2020 Research and Innovation Programme under grant agreement No 883751.
https://www.europewave.eu/
ABOUT RENMARINAS DEMOS
The RENMARINAS DEMOS Programme was established by Spain’s Ministerio para la Transición
Ecológica y el Reto Demográfico (Ministry for Ecological Transition and the Demographic Challenge)
to grant aid for investment in pilot projects, test platforms and port infrastructure for marine
renewables. This was established within the framework of the European Union-funded Recovery,
Transformation and Resilience Plan, Next Generation EU. The programme provides aid in the form of
a non-refundable grant managed by IDAE, Instituto para la Diversificación y Ahorro de la Energía
(Institute for Diversifcation and Energy Saving).
ABOUT ENTE VASCO DE LA ENERGIA (EVE)
The Ente Vasco de la Energía (EVE) is the Basque Country's energy agency, a public body established
by the Basque Government. EVE serves as a central force in the region's energy sector, with a focus
on the promotion of energy efficiency, the expansion of renewable energy sources, the development
of sustainable energy policy, and the advancement of innovative energy technologies. The funding
has been provided through the Grants programme for investment in the demonstration and validation
of emerging marine renewable energy technologies 2023 to further support the ACHIEVE Programme.
Share your feedback