MoorPower’s First Operational Review
•
•
•
•
•
•
MoorPower Demonstrator achieves goals during its initial operational phase, signalling ability
to meet commercialisation pathway targets
Over 2,000 hours of operations data gathered and analysed
Commercial aquaculture partner’s feeding barge motion and energy consumption data
gathered and analysed
Core design proven with MoorPower modules functioning as predicted
Results validate power take-off architecture common to both CETO and MoorPower
MoorPower numerical models validated using Demonstrator performance data and
commercial feeding barge motion data, providing confidence in Carnegie’s ability to forecast
the performance of the Commercial MoorPower System for a variety of barges globally
MoorPower operating in waters off Fremantle, Western Australia
Carnegie Clean Energy Limited (ASX: CCE) (“Carnegie” or the “Company”) is pleased to provide a
progress update on the successful outcomes achieved during the initial operational phase of the
MoorPower Scaled Demonstrator. This MoorPower Demonstrator Project, supported by the Blue
Economy CRC and other partners, is a key step in the MoorPower commercialisation pathway,
developing a sustainable and cost-effective energy solution for aquaculture and other offshore
sectors.
The MoorPower Demonstrator was deployed and entered operation in January 2024 and has provided
over 2,000 hours of operational data during its initial operational phase. It was brought back into port
for routine inspection and planned maintenance in April 2024, with operations expected to re1
21 North Mole Drive, North Fremantle WA 6159 | PO Box 39, North Fremantle WA 6159
Phone: +61 8 6168 8400 | www.carnegiece.com | ABN 69 009 237 736
commence in the coming weeks. This initial operational phase (January – April 2024) was primarily in
calmer months, which enabled the team to monitor the MoorPower modules and ensure they were
functioning as engineered prior to the more significant anticipated sea conditions of the winter
months to come.
During the initial operational phase, MoorPower endured a variety of sea states, with two notable
events exceeding the average wave conditions typically present, demonstrating the durability of the
MoorPower system, which will be further tested in the next winter operational phase.
Overall, the recent data gathered on the Demonstrator combined with recent data gathered from an
operating feeding barge in Tasmania provide confidence that the Commercial MoorPower System
will perform as expected and can deliver significant decarbonisation (reduced diesel requirements)
and other benefits for operating feeding barges.
MoorPower Commercialisation Pathway
In reviewing MoorPower’s performance during the initial operational phase, it is useful to refer back
to the objectives, targets and intended outcomes of the MoorPower Demonstrator Project in the
context of the technology’s commercialisation pathway.
During MoorPower concept development the team set product requirements such as not negatively
impacting operations and decarbonisation goals including diesel replacement targets:
•
•
Initial goal: MoorPower systems to produce 50% of the annual average energy required
Future goal: MoorPower systems to produce 100% of the annual average energy required
Following the requirement and concept phases, Carnegie:
2
21 North Mole Drive, North Fremantle WA 6159 | PO Box 39, North Fremantle WA 6159
Phone: +61 8 6168 8400 | www.carnegiece.com | ABN 69 009 237 736
•
•
•
•
•
•
•
Secured financial support from the Blue Economy Cooperative Research Centre for the
MoorPower Scaled Demonstrator Project. This $3.4m project is delivered with funding
support from the Blue Economy CRC and in close collaboration with a consortium of partners
including two of Australia’s largest aquaculture companies, Huon Aquaculture and Tassal
Group. Academic and industry partners include DNV GL Australia, Advanced Composite
Structures Australia, University of Tasmania, Climate KIC/Australian Ocean Energy Group,
AMC Search and University of Queensland.
Completed a preliminary design for the Commercial MoorPower System, to ensure the
Demonstrator was aligned with and de-risked the future commercial product design.
Completed detailed design for the MoorPower Scaled Demonstrator for deployment in
Western Australia .
Captured motion data from an operating feeding barge.
Built MoorPower Demonstrator at Carnegie’s research facility.
Deployed and operated MoorPower Demonstrator in Western Australia.
Validated MoorPower Numerical Models and Design.
The MoorPower Demonstrator, built in 2023 and deployed in January 2024, is the first physical
production and operation of the MoorPower system.
The MoorPower Demonstrator Project was designed to deliver 2 key objectives and outcomes which
are summarised in the below table.
The analysis and validation work completed over recent months has been delivered in order to confirm
that the Demonstrator is delivering on the intended objectives and outcomes. This process is visually
mapped in the below flow diagram with the findings outlined in detail in the next sections.
3
21 North Mole Drive, North Fremantle WA 6159 | PO Box 39, North Fremantle WA 6159
Phone: +61 8 6168 8400 | www.carnegiece.com | ABN 69 009 237 736
Analysis and validation process flow
4
21 North Mole Drive, North Fremantle WA 6159 | PO Box 39, North Fremantle WA 6159
Phone: +61 8 6168 8400 | www.carnegiece.com | ABN 69 009 237 736
Objective 1: Validation of MoorPower Design
The deployed MoorPower Demonstrator serves as a functional test of the MoorPower technology
which can be used to validate the design to de-risk the Commercial MoorPower System. The
Demonstrator’s functional performance has yielded encouraging results that surpassed the team's
initial expectations and have validated the system’s module auto-alignment, power train architecture,
electrical architecture and control system strategy.
During the initial operational phase, the system was largely exposed to mild sea states with more
significant winter sea states expected in the coming months. In March 2024, the system was exposed
to its largest sea state to date. During this time, the Demonstrator experienced maximum wave height
up to 1.5m, which when scaled to a commercial scale would be equivalent to maximum wave height
of 3m at a representative commercial site.
Module auto-alignment
One of MoorPower’s key features is its module auto-alignment, which allows the module to maintain
alignment with its moorings despite the roll and pitch of the barge. The mooring lines connected to
each of the MoorPower modules on the barge are anchored to fixed reference points on the seabed.
When the barge moves due to the wave action, the orientation of the moorings with respect to the
barge varies. The belts that terminate the moorings and wrap on the MoorPower module drums can
become misaligned with their drum if the modules are fixed to the barge. This misalignment can be
detrimental to the endurance of the belt and can create unwanted wear. To solve this problem, the
team at Carnegie developed a concept that allows the drums to self-align with their respective
mooring lines. This development involved extensive numerical simulations to optimise the position of
the axes, centre of gravity and moment of inertia of the components.
Module reorienting automatically to maintain alignment of drum and belt
During the initial phase of operations, the team was pleased to see excellent functional performance
of the module auto-alignment. The module carriage and belt maintained alignment as designed. No
noticeable wear was observed on the belt during detailed inspection as part of the routine inspection
and maintenance. This is of significant importance to Carnegie given it is a key feature for the
Commercial MoorPower System to be deployed on operating barges and because elements of the
5
21 North Mole Drive, North Fremantle WA 6159 | PO Box 39, North Fremantle WA 6159
Phone: +61 8 6168 8400 | www.carnegiece.com | ABN 69 009 237 736
auto-alignment are also present in the CETO system, including the upcoming ACHIEVE programme
deployment in Spain.
Power train architecture
The architecture of MoorPower’s power train has also been demonstrated. The power train
architecture defines the physical arrangement of all components that capture and covert the motion
of the barge into electricity, namely the drum, mooring tensioner, transmission system, gearbox and
electrical generator. The functional performance of the power train has been validated through the
successful generation of electricity during the initial phase of operations.
This marks the first offshore operational test of Carnegie’s belt-based power take-off system and
provides the team with critical data and learnings that are invaluable for both the Commercial
MoorPower System and the CETO technology, which will be deployed in Spain through the ACHIEVE
Programme.
Electrical architecture
The electrical architecture, shared between the Commercial MoorPower System and Carnegie's
flagship CETO technology, has also proven successful in this Demonstrator project. The electrical
architecture consists of a common DC bus that connects the main electrical components of the system.
The DC bus handles the power flow coming from each of the module generator converters and
dispatches this power to the battery converter and the various loads in the system. This success boosts
confidence in both the Commercial MoorPower System and the upcoming CETO deployment in the
Basque Country, Spain as part of the ACHIEVE Programme.
Control system strategy
The onboard control system has demonstrated robust functionality with 100% availability of the
control system recorded during the operational period. The control system demonstrated the ability
to transition reliably between different modes of operations such as power generation, stand-by and
turned off. It also proved able to do so independently for each of the three MoorPower modules in
the system which supports the future reliability of the system.
The controller also demonstrated its ability to accurately control the force applied in each of the
module mooring lines independently. This is a key feature that enables Carnegie to optimise the full
MoorPower system power performance. The control scheme targets an overall force to be applied in
each mooring lines. This force varies with time as a function of various parameters. In the
Demonstrator, the team found that controller operated as intended – it was able to track in real time
the various parameters and apply, in a timely manner, the required torque to achieve the overall
control force.
6
21 North Mole Drive, North Fremantle WA 6159 | PO Box 39, North Fremantle WA 6159
Phone: +61 8 6168 8400 | www.carnegiece.com | ABN 69 009 237 736
Objective 2: Validation of MoorPower Numerical Modelling
Carnegie has developed a suite of numerical modelling tools which can be used to model, design and
forecast the performance of the Commercial MoorPower System on offshore barges of various sizes,
dimensions and characteristics. This capability is key to global commercialisation of the technology.
To validate that Carnegie’s modelling tools are accurately modelling MoorPower and able to reliably
predict performance, two key data sets have been analysed: the performance of the MoorPower
Demonstrator deployed in Western Australia and motion data gathered from instrumentation placed
on a partner’s operating feeding barge in Tasmania.
In addition, to ensure that MoorPower is able to meet its decarbonisation goal of producing at least
50% of the annual average energy required by the host barge, instrumentation has been placed on a
partner’s operating feeding barge that captures the energy consumption of the barge.
By confirming that the model is accurately modelling the barge hydrodynamics and forces, Carnegie
can validate the ability to accurately forecast the performance of the system. By understanding in
depth how these operating barges are using energy, Carnegie can ensure that the system manages
the power produced and stored to supply the required energy for the barge to meet operational and
decarbonisation targets. These validation activities are outlined in more detail below.
Operating Feeding Barge Motion Data Validation
To validate that Carnegie’s numerical models can accurately predict the amount of energy that
MoorPower can capture and convert, motion data was gathered on an operating feeding barge in
Tasmania for approximately a year. The corresponding wave condition parameters such as wave
height, wave period and wave direction were also measured using a wave buoy deployed in the vicinity
of the feeding barge.
Wave Direction-intensity histogram at Tasmanian Site
7
21 North Mole Drive, North Fremantle WA 6159 | PO Box 39, North Fremantle WA 6159
Phone: +61 8 6168 8400 | www.carnegiece.com | ABN 69 009 237 736
University of Tasmania, a partner in the MoorPower Demonstrator Project, installed an Inertial
Measurement Unit (IMU) on a 600 tonne operating feed barge in Tasmania. The IMU was fitted in the
plant room close to the barge’s centre of mass and accurately measures acceleration (x, y, z directions)
and angular velocity, transmitting this data to an on-barge processing PC, which in turn calculates the
heave, surge and sway, pitch, roll and yaw.
Instrumentation being fitted to operating aquaculture barge in Tasmania
Data collected from the barge was then used to calculate the motion of the potential MoorPower
module locations on the barge which was then used to calculate the potential wave power generation
profile and correlate this with sea states.
This real motion data was analysed and found to have a good correlation with Carnegie’s separate
numerical modelling outcomes. This is illustrated in the two plots below showing a comparison
between the measured and modelled barge modes of motions most contributing to power (heave and
surge) for the most occurring sea state at the site. The results show an excellent match, thus validating
Carnegie’s ability to utilise numerical models to forecast the performance of MoorPower for offshore
vessels such as feeding barges.
Comparison between the measured and modelled barge mode of motions
8
21 North Mole Drive, North Fremantle WA 6159 | PO Box 39, North Fremantle WA 6159
Phone: +61 8 6168 8400 | www.carnegiece.com | ABN 69 009 237 736
MoorPower Demonstrator performance validation
Carnegie has also validated its numerical modelling capability by analysing the performance of the
Demonstrator in its real operating environment in Western Australia and comparing it against the
numerical modelling simulations of the Demonstrator in those same conditions. This includes
performance data from the MoorPower Demonstrator and utilises real wave data captured by
Carnegie’s own wave buoy (which captures data such as wave height, direction, and period).
Small scale barge motions compared with numerical model
Following analysis of several sea states, the team found a match between the modelled/expected
performance of MoorPower in specific conditions and the actual performance of MoorPower in those
conditions. This confirms that Carnegie can accurately predict the performance of the MoorPower
system for future sites and various configurations. This is important as there are a wide range of sites,
barges sizes and deck loading capacities, which all have an impact on MoorPower’s ability to generate
energy. Knowing that Carnegie can accurately forecast performance with all of these variables is a
powerful tool in the commercialisation of the MoorPower technology.
Commercial MoorPower System performance estimates
Using the validated numerical models, Carnegie estimated the performance potential of a Commercial
MoorPower System. Estimates indicate that an annual average electrical power of 30 kW can be
produced at the site in Tasmania where the operating feeding barge motions was gathered. This
number can be significantly increased at a more energetic site or if MoorPower were deployed on a
newly built barge which would allow higher loads to be applied. This result is in line with Carnegie’s
initial modelling completed at the start of the project and, based on energy consumption data
gathered, validates Carnegie’s ability to achieve its initial product goal, to produce more than 50% of
the annual average energy demand.
9
21 North Mole Drive, North Fremantle WA 6159 | PO Box 39, North Fremantle WA 6159
Phone: +61 8 6168 8400 | www.carnegiece.com | ABN 69 009 237 736
Next Steps
Carnegie is encouraged by the performance of the MoorPower Demonstrator during its initial
operational phase. Once the current inspection and planned maintenance regime is completed, the
system will be redeployed for its next operational phase in the coming weeks.
The project will continue to collect and analyse data from the Demonstrator and operating feeding
barges to inform the next stage of the technology's development, the development of the Commercial
MoorPower System for deployment on an operating aquaculture asset. The Company will continue to
share findings from these activities.
In early June the project partners will come together for a project meeting as part of the annual Blue
Economy CRC Participants Workshop. A number of potential hosts of the first MoorPower Commercial
System will also be in attendance to advance the commercial scale project.
This announcement has been authorised by the Chairman and CEO.
For more information
Carnegie Clean Energy Limited
+61 8 6168 8400
enquiries@carnegiece.com
www.carnegiece.com
ABOUT MOORPOWER
As the aquaculture sector expands its operations offshore, the demand for clean and reliable energy
becomes increasingly critical. The reliance on diesel generators for energy-intensive offshore
activities, such as feeding barges, brings with it a host of challenges, including high costs,
environmental risks, and carbon emissions. This issue extends beyond aquaculture to encompass
various moored vessels across the blue economy.
In response to this challenge, Carnegie Clean Energy developed MoorPower, a product that leverages
the core principles of the CETO technology and the Company’s extensive expertise to create an
innovative wave converter system specifically designed for offshore energy demand applications.
MoorPower is set to transform the way energy is harnessed offshore, with its initial target market
being aquaculture barges and vessels that require electrical power while operating in remote offshore
locations.
The MoorPower Demonstrator Project has support from the Blue Economy CRC and is being delivered
in collaboration with additional partners as shown below.
10
21 North Mole Drive, North Fremantle WA 6159 | PO Box 39, North Fremantle WA 6159
Phone: +61 8 6168 8400 | www.carnegiece.com | ABN 69 009 237 736
ABOUT BLUE ECONOMY CRC
The Blue Economy Cooperative Research Centre (CRC) is established and supported under the
Australian Government’s CRC Program, grant number CRC-20180101. The CRC Program supports
industry-led collaborations between industry, researchers and the community. With a 10-year life, the
Blue Economy CRC brings together 43 industry, government, and research partners from ten countries
with expertise in aquaculture, marine renewable energy, maritime engineering, environmental
assessments and policy and regulation. Further information about the CRC Program is available at
www.business.gov.au.
ABOUT CARNEGIE
Carnegie Clean Energy (ASX: CCE) is a technology developer focused on delivering ocean energy
technologies to make the world more sustainable. Carnegie is the owner and developer of the CETO®
and MoorPower® technologies, which capture energy from ocean waves and convert it into electricity.
Using the latest advances in artificial intelligence and electric machines, Carnegie optimally controls
our technologies to generate electricity in the most efficient way possible. The company has a long
history in ocean energy with a track record of world leading developments. Based in Australia with a
global presence, Carnegie’s wholly owned international subsidiaries including CETO Wave Energy
Ireland and Carnegie Technologies Spain are actively engaged in our product development.
11
21 North Mole Drive, North Fremantle WA 6159 | PO Box 39, North Fremantle WA 6159
Phone: +61 8 6168 8400 | www.carnegiece.com | ABN 69 009 237 736
Share your feedback
Discover