Quarterly Activities/Appendix 4C Cash Flow Report
Released
Released
Announcement PDF
REPORT TO SHAREHOLDERS
QUARTER ENDED 30 JUNE 2025
BOARD OF DIRECTORS & CEO
QUARTER HIGHLIGHTS
Non-Executive Chairman
Anthony Shields
▪
Non-Executive Director
Grant Mooney
▪
Non-Executive Director
Michael Fitzpatrick
▪
Chief Executive Officer
Jonathan Fievez
▪
▪
CONTACT DETAILS
www.carnegiece.com
enquiries@carnegiece.com
+61 8 6168 8400
21 North Mole Drive
North Fremantle WA 6159
PO Box 39
North Fremantle WA 6159
▪
Commenced development of 6MW CETO wave energy array and signed
MOU with BiMEP as the potential site (subsequent to the quarter)
Signed MOU with Chugachmiut to explore commercial CETO projects for
remote Alaskan communities
Awarded $335k by Blue Economy CRC for preliminary design of
MoorPower Commercial Pilot Project
Advanced ACHIEVE manufacturing and procurement, including partnership
with SKF on PTO Units
Signed Biscay Marine Energy Platform (BiMEP) contract for the ACHIEVE
Programme’s CETO deployment
Received €1.6M ($2.8M AUD) ACHIEVE Programme payments that support
the first CETO deployment in Europe at BiMEP
- €1.2M (approx. $2.1M AUD) RENMARINAS DEMOS Advanced Payment
- €137k (approx. $234k AUD) EuropeWave Milestone Payment
- €291k (approx. $521k AUD) EuropeWave Milestone Payments (these
were received subsequent to the quarter)
Carnegie’s CEO, Mr Jonathan Fiévez, commented on the Quarter:
"Carnegie has been working hard to deliver the ACHIEVE Programme during the
quarter with procurement, testing, site works and wave buoy deployment
comprising just a small fraction of theeffort the team is putting in to deliver this
important project that is key to unlocking CETO commercialisation.
In parallel, our MoorPower technology reached a significant milestone, with the
Preliminary Design now underway supported by the Blue Economy CRC. This puts
us closer than ever to commercial scale deployment of our MoorPower
technology.
Looking to the future, we have signed strategic Memoranda of Understanding
with BiMEP to develop a 6MW wave energy array in Europe and Chugachmiut to
explore CETO applications for remote Alaskan communities. Both opportunities
reflect the significant global potential for CETO and recognition that our CETO
technology is an in-demand technology for both industry and communities across
Europe and North America.
It really feels like the business is at an inflection point with a lot of potential to be
realised in the near and medium term.”
ISSUED 31 JULY 2025 | 1
REPORT TO SHAREHOLDERS
QUARTER ENDED 30 JUNE 2025
Core Products
Who is Carnegie?
Carnegie develops ocean energy technologies to make the world more
sustainable. We provide advanced and competitive wave energy
products for global renewable energy markets.
Waves are an untapped renewable energy source that is consistent,
predictable, and globally distributed. The scale of the opportunity is
significant, Ocean Energy Europe (OEE) forecasts significant growth for
wave energy with a €653b market potential by 2050.
CETO
CETO is a submerged buoy harnessing energy from ocean waves. Sitting
a few meters below the surface of the ocean, CETO converts wave energy
into zero-emission electricity. This clean and predictable energy supply
can be harnessed to provide a reliable energy source 24/7. The CETO
technology is continually improving through cost reduction measures and
increasing the energy supply capacity through intelligent innovation.
MoorPower
MoorPower is a wave energy product for offshore demand applications.
A spin-off from the CETO technology, MoorPower provides power for
offshore moored vessels, such as feed and lighting barges used in
Aquaculture. MoorPower can replace and reduce diesel generator usage
in offshore environments, reducing risk and carbon emissions.
PRODUCTS
Carnegie’s CETO and MoorPower technologies have both made important advancements throughout
the Quarter. MoorPower has progressed to the next phase of development with the commencement
of the Preliminary Design Project funded by the Blue Economy CRC. The ACHIEVE Programme has
completed several major milestones including electrical and control testing activities, as well as receipt
of many critical components. CETO has progressed its commercialisation pathway with the
announcement of Memorandum of Understanding with the Biscay Marine Energy Platform and
Chugachmiut for future commercial scale deployments.
Products – CETO and the ACHIEVE Programme
ACHIEVE Programme delivery has been a key activity this quarter. Alongside successful electrical and
control system testing at SEI, the team continues to manage the CETO manufacturing supply chain
and advance pre-deployment activities at BiMEP, maintaining focus on CETO’s path to
commercialisation.
Strategic Partnership with SKF for CETO PTO System
Carnegie has partnered with SKF to drive innovation in the CETO Power Take-Off (PTO) system for the
ACHIEVE Programme. This collaboration combines SKF's world-class engineering and manufacturing
capabilities with Carnegie’s CETO technology expertise to optimise performance, enhance reliability,
and accelerate CETO commercialisation. Building on SKF's early involvement in the ACHIEVE PTO
bearing and shaft design, SKF was contracted to manufacture these components and then assemble
three PTO units for the ACHIEVE Programme. This partnership reinforces the CETO supply chain with
a globally recognised leader, capable of adding value on CETO's commercialisation pathway.
QUARTERLY REPORT | ISSUED 31 JULY 2025
2
Carnegie CEO and Chairman inspecting ACHIEVE components and SKF Manufacturing Capabilities
Through ACHIEVE, Carnegie is conducting rigorous testing across various CETO components to ensure
optimal performance and reliability. During the quarter, electrical and control testing was successfully
completed on the ACHIEVE system at SEI's facilities in the Basque Country. This important milestone
validated the integration and functionality of the system, as well as its communication and control
capabilities in advance of the ACHIEVE deployment. The transformer subcomponent testing was also
successfully completed.
The next key testing campaign is the comprehensive testing of the Power Take-Off (PTO) units at the
SKF Schweinfurt facility. These units will undergo extensive testing once SKF finishes their
manufacturing activities, receives all external components and completes assembly.
Manufacturing and Supply Chain Management
In addition to testing activities, the Carnegie team has been focused on manufacturing and procuring
all necessary components for the ACHIEVE CETO unit. This encompasses a wide range of elements,
including electrical, mechanical, structural, moorings, foundations, control, and sensors. The CETO
supply chain spans the Basque Country and wider Europe, with specialist global suppliers also playing
a vital role. This process requires close engagement with suppliers, management of complex system
interfaces and ensuring all equipment meets the prescribed specifications and requirements.
CETO components undergoing fabrication, assembly and testing
Pre-Deployment Activities at BiMEP
Pre-deployment activities have commenced at the Biscay Marine Energy Platform (BiMEP) to ensure
the berth is fully prepared for CETO deployment. To date, this has included BiMEP undertaking
QUARTERLY REPORT | ISSUED 31 JULY 2025
3
essential site works at Carnegie’s berth to remove previous installations and the subsequent
deployment of new wave buoys. These small but capable wave buoys provide valuable live-streamed
data that supports knowledge about the real-time site conditions and will continue to provide crucial
information throughout the ACHIEVE Programme.
Deployment of wave buoys and site preparations at Carnegie’s berth at BiMEP
Stakeholder Engagement
Beyond the technical advancements, Carnegie has also sustained active engagement with key funders
and stakeholders of the ACHIEVE Programme, including the EuropeWave Buyers Group, Ente Vasco
de la Energía, IDAE (Instituto para la Diversificación y Ahorro de la Energía), and Export Finance
Australia. A recent achievement includes the successful System Integration Review undertaken with
the EuropeWave Buyers Group, an important milestone under the EuropeWave contract.
R&D - Continuous Improvement
This quarter has also seen exciting advancements with ARC
Fellow at the University of Adelaide, Natalia Sergienko, who
is focused on control system innovation in close
collaboration with Carnegie. This hands-on research is
directly contributing to continuous improvement in CETO
control, pushing the boundaries of wave energy innovation
through dedicated research and development. This
collaboration is one of several important research
partnerships Carnegie is involved in. These parallel research
and development activities are undertaken to deliver
learnings and cost reduction outcomes along the CETO
commercialisation pathway.
Testing at University of Adelaide
Beyond ACHIEVE
In parallel with delivery of ACHIEVE, Carnegie is also actively developing the next steps on the CETO
commercialisation pathway beyond the ACHIEVE Programme. This quarter, Carnegie has solidified key
partnerships through the signing of Memoranda of Understanding (MOUs) which will support
development of future CETO projects and strengthen the commercialisation opportunities for CETO.
QUARTERLY REPORT | ISSUED 31 JULY 2025
4
BiMEP 6MW CETO Array: Scaling Up in Europe
In July, Carnegie announced the development of a 6MW CETO
wave energy array in Europe and signed a Memorandum of
Understanding (MOU) with the Biscay Marine Energy Platform
(BiMEP) as the potential site of this array project. This proposed
array would include six of the 1MW commercial-scale CETO
units, all connected to the grid via BiMEP’s existing offshore
cable and grid connection. The Company will be undertaking the
technical and commercial activities required to unlock the
delivery of the first CETO array in Europe. Proving the efficiency
and cost-effectiveness of a multi-unit array is an important step
in accelerating CETO’s commercialisation pathway.
Signing BiMEP MOU
Chugachmiut: Exploring CETO in Alaska
During the quarter, Carnegie also signed a Memorandum of Understanding with Chugachmiut to
explore the development of CETO projects in the Chugach Region of Southcentral Alaska.
Chugachmiut, a company dedicated to serving the seven Native tribes in the Chugach Region, is
actively investigating how wave energy can provide clean, affordable, and reliable electricity to
communities within their service area. This collaboration represents a significant opportunity to
demonstrate CETO's versatility and its potential to deliver reliable power in remote, off-grid or weakgrid locations.
Products – MoorPower
Carnegie is now strategically accelerating its entry into the commercial aquaculture market with its
MoorPower technology. In June, the Blue Economy Cooperative Research Centre (Blue Economy CRC)
awarded $335k to fund preliminary design activities specifically aimed at unlocking investment in a
subsequent MoorPower Commercial Pilot Project. The ultimate goal of the Pilot is to deploy and
operate the first commercial MoorPower system on an operating feeding barge. The Preliminary
Design Project will enable this by advancing the design. It will be delivered by Carnegie in partnership
with Huon Aquaculture, Advanced Composite Structures Australia, and the University of Tasmania,
alongside specialist subcontractors ADEC Kedge, AMC Search and Exact Control. The Project bridges
the gap between the completed MoorPower Scaled Demonstrator and the first Commercial Pilot.
This preliminary design project will scale and optimise the MoorPower system for operating feeding
barges, incorporating in-depth assessments of aquaculture’s operational parameters. The design
phase is crucial for laying the groundwork for the intended deployment of MoorPower on an
operational feeding barge, marking its first commercial application in the aquaculture industry.
Carnegie aims to become a leading provider of advanced wave energy mooring solutions for the
offshore aquaculture industry, delivering enhanced stability, cost-effective mooring, and reduced
environmental impact by replacing traditional diesel generation.
QUARTERLY REPORT | ISSUED 31 JULY 2025
5
MoorPower Project Manager James Walker visits Tasmania to view project partner Huon’s activities
During the quarter, the MoorPower Project Manager spent time with Aquaculture companies in
Tasmania for a deep dive experience of their daily operations to ensure all operational requirements
have been captured in the MoorPower specifications.
EVENTS
Carnegie's expanding presence in the Basque Country was a central theme this quarter, with the
Basque team hosting an office warming event for key partners and collaborators. The event featured
presentations from Carnegie staff who provided project updates, highlighted recent achievements,
and discussed the strategic significance of Carnegie’s new office at BIC Bizkaia Ezkerraldea in the
Basque Country. The Company was also able to extend our gratitude to our partner SAITEC for their
invaluable support in hosting us in their facilities as we settled into the region.
Carnegie’s Chief Technology Officer, Alexandre Pichard, also presented the CETO technology during
the EBN Congress Pitch Sessions hosted at BIC Bizkaia Ezkerraldea, which drew over 300 attendees
from more than 175 innovation organisations.
left: Carnegie CEO and MoorPower Engineer with representatives from ACS-A, Huon and Tassal following the MoorPower
presentation at the BECRC Participants Workshop. Right: tour of BIC Bizkaia Ezkerraldea during the recent office warming
QUARTERLY REPORT | ISSUED 31 JULY 2025
6
The Carnegie team in Australia engaged with key industry partners at the Blue Economy Cooperative
Research Centre (BECRC) participants workshop in Tasmania. During the event, team members
delivered presentations and took part in panel discussions on the MoorPower, MoTWEC, and CETO
projects. These engagements provide important opportunities to share expertise and collaborate with
industry, government and academic partners in Australia and New Zealand.
CORPORATE
Investor Engagement
Carnegie is actively expanding its global investor base and promoting its CETO technology
advancements. During the quarter and subsequent to the quarter end, Carnegie’s CEO and Chairman
undertook significant investor engagement initiatives in both Europe and North America.
Carnegie CEO Jonathan Fiévez presents during the recent Germany Roadshow
Chief Executive Officer, Mr Jonathan Fiévez, and Chairman, Mr Anthony Shields, recently completed a
productive investor roadshow across Germany. This engagement, facilitated by European advisor
DGWA GmbH, aimed to broaden Carnegie’s European profile and increase awareness of CETO's
progress among strategic investors and industry players. Meetings were held with retail, institutional,
and large private investors, leveraging DGWA's extensive network. This initiative reinforces the value
of Carnegie's dual listing on the Frankfurt, Tradegate, and Stuttgart Stock Exchanges (WKN: A2DJFY).
Previously, Mr Fiévez and Mr Shields conducted an investor roadshow in the United States. This
focused on introducing Carnegie and CETO's capabilities to North American investors, including
institutional funds and private equity groups in key financial centres. This engagement complements
Carnegie’s listing on the OTCQB Market in the United States under the ticker symbol CWGYF, which
provides American investors with an accessible platform to trade Carnegie's shares.
These strategic roadshows are crucial for attracting capital, fostering investor relationships, elevating
Carnegie's global profile and supporting the commercialisation of CETO and MoorPower.
QUARTERLY REPORT | ISSUED 31 JULY 2025
7
Investor Hub
Since its launch last quarter, Carnegie's Investor Hub has proven to be a valuable resource for our
shareholders. The platform has successfully provided a central point of access for important
announcements, video content, and comprehensive company updates, fostering a deeper
understanding of Carnegie's journey. The Company encourages all interested parties who have not
yet signed up to create an account to stay closely connected and engaged with Carnegie's progress.
You can join Carnegie’s community at: http://investors.carnegiece.com/auth/signup
ACHIEVE Finance
This quarter, the ACHIEVE Programme received significant milestone payments, with total payments
amounting to €1.6M (approximately $2.8M AUD), directly supporting the CETO deployment at BiMEP.
This includes a €1.2M (approx. $2.1M AUD) advanced payment from the RENMARINAS DEMOS
programme. This advanced payment (along with the previous quarter’s €318k (approx. $545k AUD)
milestone payment from EVE), was unlocked by an Export Finance Australia-backed bank guarantee,
which allows the Company to access grant funds during the project.
Additionally, Carnegie received a €137k (approx. $234k AUD) milestone payment from EuropeWave.
This payment specifically acknowledges the successful completion of electrical and control system
testing at SEI's facilities in the Basque Country.
Subsequent to the quarter, EuropeWave milestone payments totalling €291k (approx. $521k AUD)
were received for key procurement activities, operations and maintenance planning and the
installation of wave buoys at the Carnegie’s BiMEP berth.
FINANCIAL NOTES
At the end of the Quarter, Carnegie had approximately $2.897 m in cash reserves.
Note 6 to Appendix 4C:
Payments to related parties of the entity and their associates were made during the Quarter. In total,
approximately $62k was paid to Directors and associates for salaries, superannuation and contracted
services.
This announcement has been authorised by the Chairman and CEO.
View and engage with this announcement on Carnegie’s Investor Hub:
https://investors.carnegiece.com/link/yVwwOe
For more information
Carnegie Clean Energy Limited
+61 8 6168 8400
enquiries@carnegiece.com
www.carnegiece.com
QUARTERLY REPORT | ISSUED 31 JULY 2025
8
ABOUT CARNEGIE AND ITS SUBSIDIARIES
Carnegie Clean Energy (ASX: CCE) is a technology developer focused on delivering ocean energy
technologies to make the world more sustainable. Carnegie Technologies Spain and CETO Wave
Energy Ireland are wholly owned subsidiaries of Carnegie Clean Energy. Carnegie is the owner and
developer of the CETO® and MoorPower® technologies, which capture energy from ocean waves and
convert it into electricity. Using the latest advances in artificial intelligence and electric machines,
Carnegie optimally controls our technologies and generates electricity in the most efficient way
possible. The company has a long history in ocean energy with a track record of world leading
developments. https://www.carnegiece.com
ABOUT ACHIEVE PROGRAMME
The ACHIEVE Programme is an initiative being
delivered by Carnegie’s subsidiaries CETO Wave
Energy Ireland under contract by EuropeWave Buyers
Group (ACHIEVE Project) and Carnegie Technologies
Spain with the support of funding awarded by the
Spanish Government through the RENMARINAS
Demos Programme (AGUAMARINA Project) and the
Basque Government through a grant from the Ente
Vasco de la Energia (ACHIEVE+ Project).
Through this collaborative initiative, Carnegie will
deploy and operate a CETO prototype at the Basque
Marine Energy Platform (BiMEP) in the Basque
Country, Spain, marking a key step on CETO’s
commercialisation pathway. The CETO Unit will operate for up to 2 years in this open ocean site and
the data collected will be used to validate the performance of the CETO technology and propel it along
the commercialisation pathway.
ABOUT EUROPEWAVE
EuropeWave PCP is an innovative R&D programme for wave
energy technology, which runs from 2022 to 2026. It combines
over €22.5m of national, regional and EU funding to drive a
competitive Pre-Commercial Procurement (PCP) programme
for wave energy.
Originally pioneered by the Wave Energy Scotland programme, the PCP model provides a structured
approach, fostering greater openness, collaboration and sharing of risk between the public sector and
technology developers. The programme will focus on the design, development, and demonstration of
cost-effective wave energy converter (WEC) systems for electrical power production that can survive
in the harsh ocean environment.
QUARTERLY REPORT | ISSUED 31 JULY 2025
9
Match-funded by the EU’s Horizon 2020 programme, EuropeWave is a collaboration between Wave
Energy Scotland (WES), the Basque Energy Agency (EVE) and Ocean Energy Europe (OEE). This
collaboration is closely aligned with the decarbonisation, industrial and competitiveness objectives of
the European Green Deal, and is part of a range of actions being taken to meet the European
Commission’s targets of 100MW of ocean energy by 2027 and at least 1GW by 2030.
This is part of the EuropeWave project that has received funding from the European
Union’s Horizon 2020 Research and Innovation Programme under grant agreement
No 883751.
https://www.europewave.eu/
ABOUT RENMARINAS DEMOS
The RENMARINAS DEMOS Programme was established by Spain’s Ministerio para la Transición
Ecológica y el Reto Demográfico (Ministry for Ecological Transition and the Demographic Challenge)
to grant aid for investment in pilot projects, test platforms and port infrastructure for marine
renewables. This was established within the framework of the European Union-funded Recovery,
Transformation and Resilience Plan, Next Generation EU. The programme provides aid in the form of
a non-refundable grant managed by IDAE, Instituto para la Diversificación y Ahorro de la Energía
(Institute for Diversifcation and Energy Saving).
ABOUT ENTE VASCO DE LA ENERGIA (EVE)
The Ente Vasco de la Energía (EVE) is the Basque Country's energy agency, a public body established
by the Basque Government. EVE serves as a central force in the region's energy sector, with a focus
on the promotion of energy efficiency, the expansion of renewable energy sources, the development
of sustainable energy policy, and the advancement of innovative energy technologies. The funding
has been provided through the Grants programme for investment in the demonstration and validation
of emerging marine renewable energy technologies 2023 to further support the ACHIEVE Programme.
QUARTERLY REPORT | ISSUED 31 JULY 2025
10
Rule 4.7B
Appendix 4C
Quarterly cash flow report for entities
subject to Listing Rule 4.7B
Name of entity
CARNEGIE CLEAN ENERGY LIMITED
ABN
Quarter ended (“current quarter”)
69 009 237 736
30 June 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
34
314
(41)
(186)
-
(6)
(e) staff costs
(617)
(2,543)
(f)
(230)
(1,055)
11
68
-
(2)
-
570
(843)
(2,840)
(1,100)
(3,910)
(a) research and development
(b) product manufacturing and operating
costs
(c) advertising and marketing
(d) leased assets
administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (Bank guarantees)
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) businesses
(c) property, plant and equipment
(d) investments
(e) intellectual property
(f)
other non-current assets
ASX Listing Rules Appendix 4C (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from disposal of:
(a) entities
(b) businesses
(c) property, plant and equipment
(d) investments
(e) intellectual property
(f)
other non-current assets
2,341
3,844
1,241
(66)
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (Net insurance less payments to
replace damage)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of
equity securities or convertible debt
securities
-
(52)
3.5
Proceeds from borrowings
-
2,500
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
(104)
(289)
3.8
Dividends paid
3.9
Other (leases)
(26)
(106)
3.10
Net cash from / (used in) financing
activities
(130)
2,053
ASX Listing Rules Appendix 4C (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,617
3,729
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(843)
(2,840)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
1,241
(66)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(130)
2,053
4.5
Effect of movement in exchange rates on
cash held
12
21
4.6
Cash and cash equivalents at end of
period
2,897
2,897
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,397
2,117
5.2
Call deposits
500
500
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,897
2,617
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
Current quarter
$A'000
(62)
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Audit
ASX Listing Rules Appendix 4C (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
2,500
2,500
7.1
Loan facilities
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
2,500
2,500
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
Lender: Ballamena Pty Ltd ATF Ellan Finance Unit Trust - $2,500,000
Interest: 15% per annum
Final Repayment Date: 30 June 2026. The Borrower can make any part or whole
repayments in advance of the Final Repayment Date at its discretion with no penalty
Security: The Lender will have a Featherweight General Security Agreement
Lender: Export Growth Bond Facility (facility) with Export Finance Australia (EFA)
This has been agreed with EFA but the bonds are not yet in place. This will provide cash
backed security on bank guarantees for Spanish grants.
Total Bond Facility Limit: €2,497,314.89 • Establishment Fee: $41,000
Bond Cash Security: 0% at commencement with right reserved to request in future
EFA has General Security over Carnegie and its subsidiaries
Risk Premium Fee: 5.0%
Bond Issuer Fee: estimated at 0.45%
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(842)
8.2
Cash and cash equivalents at quarter end (item 4.6)
2,897
8.3
Unused finance facilities available at quarter end (item 7.5)
8.4
Total available funding (item 8.2 + item 8.3)
8.5
Estimated quarters of funding available (item 8.4 divided by
item 8.1)
2,897
3.44 quarters
Note: if the entity has reported positive net operating cash flows in item 1.9, answer item 8.5 as “N/A”. Otherwise, a
figure for the estimated quarters of funding available must be included in item 8.5.
8.6
If item 8.5 is less than 2 quarters, please provide answers to the following questions:
8.6.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
ASX Listing Rules Appendix 4C (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
8.6.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
8.6.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
Note: where item 8.5 is less than 2 quarters, all of questions 8.6.1, 8.6.2 and 8.6.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accountin
Share your feedback
Discover