Quarterly Activities/Appendix 4C Cash Flow Report
Released
Released
Announcement PDF
REPORT TO SHAREHOLDERS
QUARTER ENDED 30 June 2026
ISSUED 29 JULY 2026 | 1
BOARD OF DIRECTORS & CEO
Non-Executive Chairman
Anthony Shields
Non-Executive Director
Grant Mooney
Non-Executive Director
Michael Fitzpatrick
Chief Executive Officer
Jonathan Fievez
CONTACT DETAILS
www.carnegiece.com
enquiries@carnegiece.com
+61 8 6168 8400
21 North Mole Drive
North Fremantle WA 6159
PO Box 39
North Fremantle WA 6159
QUARTER HIGHLIGHTS
▪ Advanced ACHIEVE Programme’s CETO Unit, commencing PTO assembly
following electrical module completion and control system validation
▪ Secured Spanish regulatory approvals for ACHIEVE CETO deployment,
granting seabed occupation and grid connection access while unlocking a
€64k (~A$103k) EuropeWave milestone payment
▪ CETO Unit set for ocean deployment in October at BiMEP berth, Bilbao
(Basque Country), Spain
▪ Awarded US TEAMER technical support valued at US$194k (A$270k) in
collaboration with Kelson Marine Co. to adapt core wave energy technology
for offshore aquaculture
▪ Extended existing loan facility’s maturity date to June 2027 to align debt
structures with upcoming project milestone cashflows
▪ Subsequent to quarter end, secured $2.5 million via Private Placement to
support development of a multi-megawatt CETO array and other ongoing
commercial expansion activities
Carnegie’s CEO, Mr Jonathan Fiévez, commented on the Quarter:
This quarter has been marked by tangible ACHIEVE Programme progress as we
see module fabrication completing, power take-off assembly underway with SKF
in Germany and transition into pre-deployment activities ahead of the first stage
of ocean deployment in October.
Importantly, this project progress is backed by strong commercial alignment and
financial support from funders and investors. The recent $2.5 million Placement
supports Carnegie to complete CETO’s grid-connected ACHIEVE deployment,
advance business development across Europe and the US, and capitalise on multi-
megawatt commercial CETO project opportunities.
In parallel with CETO advancements, the Company has also been progressing
opportunities to utilise our wave energy intellectual property to address energy
challenges in Defence and Aquaculture markets. There is strong interest in
Carnegie’s technologies and know-how, as demonstrated through our selection
for a US TEAMER program award to adapt our wave energy IP for offshore
aquaculture.
REPORT TO SHAREHOLDERS
QUARTER ENDED 30 JUNE 2026
QUARTERLY REPORT | ISSUED 29 JULY 2026 2
PRODUCTS
Carnegie advanced key projects and commercial development across our technology portfolio this
quarter. A primary focus was driving the ACHIEVE programme forward through CETO assembly and
testing regimes in preparation for deployment at BiMEP later this year, alongside ongoing progress to
commercialise complimentary technologies in Aquaculture and Defence markets.
Products – CETO
ACHIEVE Programme
Operational activity during the quarter delivered technical and regulatory milestones across the
ACHIEVE Programme, progressing Carnegie's CETO technology toward phased deployment at the
Biscay Marine Energy Platform (BiMEP) in the Basque Country (Spain) commencing in October.
Following assembly of the Electrical Module with manufacturer SEI in the Basque Country, operations
progressed to the assembly and integration of the Power Take-Off (PTO) system. Assembly of
Modules, including generators, tensioners, shafts, couplings, bearings, seals, and sensors, is underway
at SKF’s manufacturing facility in Germany. This work connects all the power generating equipment
inside the module. Following assembly, system testing will validate communication and control
operations between the Electrical and PTO Modules prior to ocean deployment at BiMEP.
Top row: PTO Module arrival at SKF Germany facility, Bottom row: PTO component assembly
To derisk subsea operations, Carnegie’s technical team completed specialised Remotely Operated
Vehicle (ROV) training. Exploring the use of advanced robotics for monitoring, mooring, and
connection procedures provides opportunities to reduce deployment and operational costs and
expand internal capabilities ahead of future commercial projects.
QUARTERLY REPORT | ISSUED 29 JULY 2026 3
Carnegie technical team undertaking specialised subsea ROV training
The ACHIEVE team has also secured the required approvals for CETO ocean deployment. As a test site,
BiMEP already has the general authorisation from Coastal and Energy Authorities of the Spanish
Government. The installation of any wave energy conversion prototype at BiMEP requires notification
to two main competent authorities: the competent authority for Energy due to grid connection and
the competent authority for Coastal Affairs due to occupation of the seabed. The receipt of these
authorisations is an important regulatory stage gate for the ACHIEVE Programme.
BiMEP deployment site location off the Basque coast
Carnegie’s wholly owned subsidiary, CETO Wave Energy Ireland, received a €64k (approx. $103k AUD)
milestone payment under the EuropeWave Phase 3 contract. This payment follows approval of two
deliverables: obtaining formal regulatory authorisation and finalising the control software required
for upcoming back-to-back Power Take-Off (PTO) testing.
During the quarter, Carnegie also provided an update regarding the ACHIEVE Programme’s staged
deployment and commissioning sequence at BiMEP. Offshore works will commence with the
QUARTERLY REPORT | ISSUED 29 JULY 2026 4
installation of seabed foundations, mooring systems, and export cable connection at the Company's
assigned berth. This will be followed by the first stage of the CETO unit’s ocean deployment, targeted
for October 2026, subject to vessel availability, supply chain lead times, and offshore weather
conditions. Following initial deployment, the planned ocean testing, grid integration, and performance
optimisation will validate three years of detailed design work, supporting CETO’s commercialisation
pathway.
Products – Other
During the quarter Carnegie continued to pursue development of spin-off technologies applicable to
aquaculture, defence, data centres and other marine market sectors. Carnegie attended the Indian
Ocean Defence and Security conference and exhibition in May with strong interest in powering remote
systems with wave energy. This builds on last year’s Power and Energy award won by Carnegie from
the Australian Defence Force’s Advanced Strategic Capabilities Accelerator (ASCA) pitch day.
Blue Economy CRC Delegation Visit to Western Australia
In July, Carnegie welcomed representatives from the Blue Economy Cooperative Research Centre (BE
CRC) to its facility in Western Australia. The BE CRC’s support and investment have been instrumental
in advancing Carnegie's MoorPower and Mooring Tensioner technologies, leveraging partner
contributions across the industry. Carnegie continues to actively explore commercial opportunities for
MoorPower, made possible by the CRC's ongoing backing. Strong collaborations remain essential to
advancing Australia’s ocean energy sector and moving innovative technologies from the workshop
into commercial reality.
Blue Economy CRC representatives with Carnegie team during visit to Carnegie's facility
QUARTERLY REPORT | ISSUED 29 JULY 2026 5
Carnegie awarded US TEAMER technical support
Aligned with Carnegie’s efforts to provide
energy solutions for the aquaculture market,
Carnegie has been selected for technical
support under the United States Testing
Expertise and Access for Marine Energy
Research (TEAMER) programme, valued at US
$194,000 (AUD $270,000).
In collaboration with Kelson Marine Co., the
awarded project; titled ‘Development of a
Finfish Array with Distributed WEC Power Integration’, focuses on adapting Carnegie’s wave energy
technology for direct integration into offshore fish pens. Funding is provided directly to Kelson Marine,
enabling Carnegie to serve as the Technical Support Recipient and leverage world-class U.S. research
infrastructure with minimal capital outlay.
EVENTS
Ocean Business Leaders’ Summit
Carnegie represented the ocean energy sector at the 2026 Ocean Business Leaders' Summit. Chief
Commercial Officer Brighid Jay participated as a panellist in the 'Unlocking the Capital: How to Make
the Ocean More Investable' session, sharing insights on driving investment into ocean technology and
engaging with regional leaders on sustainable blue economy initiatives.
Left: Carnegie CCO addressing the Ocean Business Leaders’ Summit. Right: University of Western Australia
student tour at the North Fremantle facility.
University of Western Australia Student Visit
During the Quarter Carnegie hosted students from the University of Western Australia at its North
Fremantle facility for an inside look at the Company’s technology development and commercialisation
pathways. The tour provided firsthand insights into how CETO captures wave energy and how
MoorPower delivers sustainable power solutions directly to offshore industries.
QUARTERLY REPORT | ISSUED 29 JULY 2026 6
CORPORATE
Extension of $2.5 million Loan Agreement
In July, Carnegie extended the maturity date of its $2.5 million Loan Agreement with Ballamena Pty
Ltd to 30 June 2027. Originally secured in October 2024 to bridge the timing gap between project
expenditure and retrospective grant receipts, the facility supported procurement expenditure for the
CETO ACHIEVE deployment in the Basque Country with repayment funded by future milestone
receipts and R&D tax incentives.
Carnegie Secures $2.5 Million Private Placement
Subsequent to the end of the quarter, Carnegie received firm commitments to raise $2.5 million
(before costs) via a Private Placement to new investors. Capital raised will primarily fund development
activities for a multi-megawatt CETO array at BiMEP, alongside execution of the ACHIEVE Programme
deployment in the Basque Country. Proceeds will also support targeted business development across
Europe and the US, while advancing technology adaptation for commercial opportunities in the
Defence and Aquaculture sectors.
FINANCIAL NOTES
At the end of the Quarter, Carnegie had approximately $1 million in cash reserves. Funds from the
Placement were received subsequent to the end of the Quarter.
Note 6 to Appendix 4C:
Payments to related parties of the entity and their associates were made during the Quarter. In total,
approximately $72.5k was paid to Directors and associates for salaries, superannuation and
contracted services.
This announcement has been authorised by the Chairman and CEO.
View and engage with this announcement on Carnegie’s Investor Hub:
https://investors.carnegiece.com/link/yzYp3P
For more information
Carnegie Clean Energy Limited
+61 8 6168 8400
www.carnegiece.com
QUARTERLY REPORT | ISSUED 29 JULY 2026 7
ABOUT CARNEGIE AND ITS SUBSIDIARIES
Carnegie is a global technology leader developing advanced, wave-powered solutions that accelerate
the world's transition to sustainable, reliable, and cost-competitive clean energy. Our focus is on
unlocking the vast, untapped potential of ocean waves. Carnegie Technologies Spain and CETO Wave
Energy Ireland are wholly owned subsidiaries of Carnegie Clean Energy.
Waves are a uniquely consistent and predictable global resource. The market opportunity is immense,
with the EU targeting 40 GW of ocean energy capacity by 2050 to achieve its decarbonisation goals,
positioning wave energy at the heart of the blue economy.
ABOUT ACHIEVE PROGRAMME
The ACHIEVE Programme is an initiative being
delivered by Carnegie’s subsidiaries CETO Wave
Energy Ireland under contract by EuropeWave Buyers
Group (ACHIEVE Project) and Carnegie Technologies
Spain with the support of funding awarded by the
Spanish Government through the RENMARINAS
Demos Programme (AGUAMARINA Project) and the
Basque Government through a grant from the Ente
Vasco de la Energia (ACHIEVE+ Project).
Through this collaborative initiative, Carnegie will
deploy and operate a CETO prototype at the Basque
Marine Energy Platform (BiMEP) in the Basque
Country, Spain, marking a key step on CETO’s
commercialisation pathway. The CETO Unit will operate in this open ocean site and the data collected
CETO
CETO is Carnegie's proprietary, fully submerged wave energy converter
(WEC), a point absorber system that converts the kinetic energy of ocean
waves into grid-ready electricity. The technology is defined by intelligent
innovation, leveraging Artificial Intelligence (AI) and advanced controls to
create an advanced wave energy converter for commercial applications.
CETO is currently progressing towards deployment in Europe under the
ACHIEVE Programme.
MoorPower
MoorPower is a CETO spin-off product designed to decarbonise offshore
operations. It provides clean, autonomous electricity for moored vessels
(like aquaculture barges), directly replacing high-risk diesel generators. By
eliminating the need for constant refuelling, MoorPower reduces carbon
emissions, operational risk, and energy costs, securing reliable power for
the world's growing blue economy.
QUARTERLY REPORT | ISSUED 29 JULY 2026 8
will be used to validate the performance of the CETO technology and propel it along the
commercialisation pathway.
ABOUT EUROPEWAVE
EuropeWave PCP is an innovative R&D programme for wave energy
technology, which is running from 2022 to 2027. It combines over €22.5m
of national, regional and EU funding to drive a competitive Pre-
Commercial Procurement (PCP) programme for wave energy.
Originally pioneered by the Wave Energy Scotland programme, the PCP model provides a structured
approach, fostering greater openness, collaboration and sharing of risk between the public sector and
technology developers. The programme will focus on the design, development, and demonstration of
cost-effective wave energy converter (WEC) systems for electrical power production that can survive
in the harsh ocean environment.
Match-funded by the EU’s Horizon 2020 programme, EuropeWave is a collaboration between Wave
Energy Scotland (WES), the Basque Energy Agency (EVE) and Ocean Energy Europe (OEE). This
collaboration is closely aligned with the decarbonisation, industrial and competitiveness objectives of
the European Green Deal, and is part of a range of actions being taken to meet the European
Commission’s targets of 100MW of ocean energy by 2027 and at least 1GW by 2030.
This is part of the EuropeWave project that has received funding from the European
Union’s Horizon 2020 Research and Innovation Programme under grant agreement
No 883751.
https://www.europewave.eu/
ABOUT RENMARINAS DEMOS
The RENMARINAS DEMOS Programme was established by Spain’s Ministerio para la Transición
Ecológica y el Reto Demográfico (Ministry for Ecological Transition and the Demographic Challenge)
to grant aid for investment in pilot projects, test platforms and port infrastructure for marine
renewables. This was established within the framework of the European Union-funded Recovery,
Transformation and Resilience Plan, Next Generation EU. The programme provides aid in the form of
a non-refundable grant managed by IDAE, Instituto para la Diversificación y Ahorro de la Energía
(Institute for Diversifcation and Energy Saving).
QUARTERLY REPORT | ISSUED 29 JULY 2026 9
ABOUT ENTE VASCO DE LA ENERGIA (EVE)
The Ente Vasco de la Energía (EVE) is the Basque Country's energy agency, a public body established
by the Basque Government. EVE serves as a central force in the region's energy sector, with a focus
on the promotion of energy efficiency, the expansion of renewable energy sources, the development
of sustainable energy policy, and the advancement of innovative energy technologies. The funding
has been provided through the Grants programme for investment in the demonstration and validation
of emerging marine renewable energy technologies 2023 to further support the ACHIEVE Programme.
Rule 4.7B
ASX Listing Rules Appendix 4C (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 4C
Quarterly cash flow report for entities
subject to Listing Rule 4.7B
Name of entity
CARNEGIE CLEAN ENERGY LIMITED
ABN Quarter ended (“current quarter”)
69 009 237 736 30 June 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
1. Cash flows from operating activities
204 726
1.1 Receipts from customers
1.2 Payments for
(a) research and development
(b) product manufacturing and operating
costs
(41) (159)
(c) advertising and marketing
(d) leased assets
(e) staff costs (601) (2,544)
(f) administration and corporate costs (176) (1,115)
1.3 Dividends received (see note 3)
1.4 Interest received 12 44
1.5 Interest and other costs of finance paid
1.6 Income taxes paid
1.7 Government grants and tax incentives
1.8 Other (Bank guarantees)
1.9 Net cash from / (used in) operating
activities
(602) (3,048)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities
(b) businesses
(c) property, plant and equipment
(d) investments
(e) intellectual property
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
ASX Listing Rules Appendix 4C (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
(f) other non-current assets – subsequent
development expenditure – CETO
Technology
(854) (5,007)
2.2 Proceeds from disposal of:
(a) entities
(b) businesses
(c) property, plant and equipment
(d) investments
(e) intellectual property
(f) other non-current assets – grants
received (1)
104 4,578
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3)
2.5 Other (Net insurance less payments to
replace damage)
2.6 Net cash from / (used in) investing
activities
(1) YTD Grants received in 2.2(f) include:
• sale in Spain of 2025 Basque R&D tax
deductions sold for $AUD1.37M
• a pre-financing 75% payment on the
COIN project in Spain of totalling
$AUD506k
• EuropeWave Milestone payments
totalling $AUD1,972M
• Australian R&D tax refund AUD$568K
(750) (429)
3. Cash flows from financing activities
- 2,116
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options 215 215
3.4 Transaction costs related to issues of
equity securities or convertible debt
securities
- (18)
3.5 Proceeds from borrowings - 120
3.6 Repayment of borrowings (29) (49)
3.7 Transaction costs related to loans and
borrowings (140) (616)
3.8 Dividends paid
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
ASX Listing Rules Appendix 4C (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
3.9 Other (leases) (26) (105)
3.10 Net cash from / (used in) financing
activities
20 1,663
4. Net increase / (decrease) in cash and
cash equivalents for the period
2,354 2,964
4.1 Cash and cash equivalents at beginning of
period
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(602) (3,048)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(750) (429)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
20 1,663
4.5 Effect of movement in exchange rates on
cash held (26) (154)
4.6 Cash and cash equivalents at end of
period 996 996
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 996 2,354
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
996 2,354
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
(72)
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
ASX Listing Rules Appendix 4C (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities 2,500 2,500
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities 2,500 2,500
7.5 Unused financing facilities available at quarter end
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
Lender: Ballamena Pty Ltd ATF Ellan Finance Unit Trust - $2,500,000
Interest: 15% per annum
Final Repayment Date: 30 June 2027. The Borrower can make any part or whole
repayments in advance of the Final Repayment Date at its discretion with no penalty
Security: The Lender will have a Featherweight General Security Agreement
Lender: Export Growth Bond Facility (facility) with Export Finance Australia (EFA)
This has been agreed with EFA and two bonds are now in place. This has provided cash
backed security on bank guarantees for Spanish RENMARINAS and EVE grants.
Bond Facility Limit: €2,497,314.89 • Establishment Fee: $41,000
Bond amount drawn down: €1,626,542
Bond Cash Security: 0% at commencement with right reserved to request in future
EFA has General Security over Carnegie and its subsidiaries
Risk Premium Fee: 5.0%
Bond Issuer Fee: estimated at 0.45%
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (602)
8.2 Cash and cash equivalents at quarter end (item 4.6) 996
8.3 Unused finance facilities available at quarter end (item 7.5)
8.4 Total available funding (item 8.2 + item 8.3) 996
8.5 Estimated quarters of funding available (item 8.4 divided by
item 8.1)
1.65 quarters
Note: if the entity has reported positive net operating cash flows in item 1.9, answer item 8.5 as “N/A”. Otherwise, a
figure for the estimated quarters of funding available must be included in item 8.5.
8.6 If item 8.5 is less than 2 quarters, please provide answers to the following questions:
8.6.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Yes. However, expenditures relating to the EuropeWave project vary from quarter
to quarter and receipt of funding from the EuropeWave Program lags behind
expenditure.
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
ASX Listing Rules Appendix 4C (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
8.6.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Subsequent to the end of the quarter, the Company has raised $2.5 million in
capital.
8.6.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: The Company expects to be able to continue its operations and meet its objectives
as a going concern through the raising of capital and utilisation of funding provided
under the EuropeWave Program.
Note: where item 8.5 is less than 2 quarters, all of questions 8.6.1, 8.6.2 and 8.6.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies
which comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 28 July 2026
Authorised by: By Board of Directors
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been
prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the
corresponding equivalent standard applies to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.