Quarterly Activities/Appendix 4C Cash Flow Report
Released
Released
Announcement PDF
REPORT TO SHAREHOLDERS
QUARTER ENDED 31 DECEMBER 2023
BOARD OF DIRECTORS & CEO
Non-Executive Chairman
Terry Stinson
QUARTER HIGHLIGHTS
▪
MoorPower demonstrator successfully deployed in North
Fremantle, supporting validation of Carnegie’s new MoorPower
wave energy converter product which can support offshore
operations by reducing reliance on diesel generators, cutting
carbon emissions, minimising risk, and lowering energy costs
▪
Carnegie Clean Energy selected as a Technical Support
Recipient in the U.S. TEAMER program, securing support worth
USD$95k for collaboration with NREL on extreme wave energy
modelling
▪
Carnegie subsidiary CETO Wave Energy Ireland, awarded
funding to participate in the WECHULL+ Project, providing
technical expertise in the development of a novel concrete
material for wave energy converters. Funding awarded from
Sustainable Energy Authority Ireland (SEAI) as part of the
European Clean Energy Transition Partnership (CETP)
Non-Executive Director
Grant Mooney
Non-Executive Director
Michael Fitzpatrick
Non-Executive Director
Anthony Shields
Chief Executive Officer
Jonathan Fievez
CONTACT DETAILS
www.carnegiece.com
enquiries@carnegiece.com
Carnegie’s CEO, Mr Jonathan Fiévez, commented on the Quarter:
+61 8 6168 8400
21 North Mole Drive
North Fremantle WA 6159
PO Box 39
North Fremantle WA 6159
"Our dedicated team has been busy delivering progress on both CETO
and MoorPower wave energy technologies this quarter.
CETO development continues under the ACHIEVE programme heading
toward a deployment next year in the Basque Country, Spain. We’re
engaging on a daily basis with both local and global suppliers to
finalise designs and secure manufacture of the key components.
In Australia, it was great to see the successful deployment of the
MoorPower Scaled Demonstrator at our North Fremantle test site.
MoorPower offers offshore operations the benefit of onboard
electricity generation from wave energy, diminishing reliance on diesel
generators. The Demonstrator will validate the performance of
MoorPower for future customers.
Securing funding for the WECHULL+ Project and selection in the U.S.
TEAMER program demonstrates our ongoing dedication to pushing the
boundaries of technology. These projects are critical the pipeline of
innovations that can deliver the performance enhancement and cost
reduction for future CETO generations.”
ISSUED 30 JANUARY 2024| 1
REPORT TO SHAREHOLDERS
QUARTER ENDED 31 December 2023
Core Products
Who is Carnegie?
CETO
MoorPower
Carnegie develops ocean energy technologies to make the world more
sustainable. We provide advanced and competitive wave energy
products for global renewable energy markets.
Waves are an untapped renewable energy source that is consistent,
predictable, and globally distributed. The scale of the opportunity is
significant, Ocean Energy Europe (OEE) forecasts significant growth for
wave energy with a €653b market potential by 2050.
CETO is a submerged buoy harnessing energy from ocean waves. Sitting
a few meters below the surface of the ocean, CETO converts wave energy
into zero-emission electricity. This clean and predictable energy supply
can be harnessed to provide a reliable energy source 24/7. The CETO
technology is continually improving through cost reduction measures and
increasing the energy supply capacity intelligent innovation.
MoorPower is a wave energy product for offshore demand applications.
A spin-off from the CETO technology, MoorPower provides power for
offshore moored vessels, such as feed and lighting barges used in
Aquaculture. MoorPower can replace and reduce diesel generator usage
in offshore environments, reducing risk and carbon emissions.
PRODUCTS
In the last quarter, the company achieved significant milestones, with particularly notable
achievements related to the testing and commissioning of the MoorPower system, leading to the
successful deployment of the MoorPower demonstrator in January 2024. In parallel, the team
continued progressing the ACHIEVE Programme, working towards deployment of CETO in Spain in
2025, aligned with the EuropeWave contract and RENMARINAS DEMOS funding previously
announced. The CETO and MoorPower activities delivered during the quarter continue moving these
technologies forwards along their commercialisation journeys. These efforts contribute to
strengthening the commercial pathway for both MoorPower and CETO.
MoorPower
During the quarter Carnegie made substantial progress in the development and deployment of
MoorPower, an innovative wave converter system designed to meet the growing demand for clean
and reliable energy in offshore operations, particularly within the aquaculture sector. Recognising the
challenges posed by diesel generators, including high costs, environmental risks, and carbon
emissions, Carnegie responded to industry needs with this new product, MoorPower. Harnessing the
fundamental principles of CETO technology, the company designed MoorPower for offshore energy
demand applications, with an initial focus on aquaculture barges and vessels operating in remote
offshore locations.
The Blue Economy CRC supported MoorPower scaled demonstrator project advanced through
onshore testing and validation of the power take-off (PTO) units during the quarter, marking a critical
phase in ensuring the reliability and functionality of the technology before offshore deployment.
Rigorous testing included assessments of control system behaviours and transitions between modes.
QUARTERLY REPORT | ISSUED 30 JANUARY 2024
2
Subsequent to the quarter end, the MoorPower demonstrator was deployed offshore in North
Fremantle, Western Australia, just offshore from Carnegie’s headquarters.
MoorPower in operation at the offshore test site in North Fremantle, WA
The successful deployment and initiation of operations of Carnegie's MoorPower represents a
significant milestone in advancing the decarbonisation of offshore operations, demonstrating
MoorPower's potential to reduce reliance on fossil fuels, lower carbon emissions, minimise risk, and
drive down costs. The deployment has been supported by the Blue Economy CRC and has been
delivered in collaboration with industry partners such as Huon Aquaculture and Tassal Group and a
range of additional expert partners. The demonstrator helps position MoorPower as a viable solution
for clean sustainable energy in offshore industries, support progress toward net-zero goals.
CETO
Progressing Carnegie’s core wave energy converter technology CETO towards its deployment in Spain
next year was also a core focus of the Company during the quarter.
Through the quarter, the team delivered planned activities of the ACHIEVE Programme, taking critical
steps to advance towards the 2025 deployment of CETO at the Biscay Marine Energy Platform (BiMEP)
in the Basque Country.
QUARTERLY REPORT | ISSUED 30 JANUARY 2024
3
The ACHIEVE Programme is an initiative being delivered by Carnegie’s subsidiaries CETO Wave Energy
Ireland under contract by EuropeWave Buyers Group (ACHIEVE Project) and Carnegie Technologies
Spain with the support of funding awarded by the Spanish Government through the RENMARINAS
Demos Programme (AGUAMARINA Project). Through this collaborative initiative, Carnegie will be
deploying and operating a CETO prototype in Europe commencing in 2025, marking a key step on the
technology’s commercialisation pathway.
Some of the recent EuropeWave ACHIEVE activities have focused on building relationships with key
suppliers and stakeholders and progressing procurement related to critical CETO components. These
early-stage relationships strengthen the commercial viability of CETO as supply chains are established
and lessons learned can be applied to future commercial projects.
With the addition of funding through the Spanish Government’s RENMARINAS DEMOS program,
announced in September 2023, additional activities funded through Carnegie Technologies Spain’s
AGUAMARINA Project are now underway. This additional funding is extending and enhancing the
ACHIEVE activities, including providing an extended CETO operational period at BiMEP and supporting
enhanced wave prediction capabilities, local infrastructure, local knowledge and local operations and
maintenance.
RECENT CETO RESEARCH AND DEVELOPMENT FUNDING AWARDS
WECHULL+
Carnegie Clean Energy's subsidiary, CETO Wave
Energy Ireland (CWEI), has been awarded £45k
as an industry partner in the WECHULL+ Project.
The project aims to investigate and test a novel
concrete material for wave energy converters,
focusing on minimising environmental impact,
increasing production availability, and reducing
costs. CWEI’s funding was provided by the
Sustainable Energy Authority Ireland (SEAI) as
part of the European Clean Energy Transition
Partnership (CETP).
As a wave energy converter use case, CWEI’s involvement in the WECHULL+ Project provides an
opportunity to develop a valuable alternative material for wave energy technologies like CETO. CWEI
will contribute technical expertise and advice based on the application of these materials to CETO
technology. The project will be delivered by a European consortium, led by the Research Institute of
Sweden (RISE), with the participation of various technical and research partners. The focus of the
project is to minimise the impact of materials on the environment, improve the availability of wave
energy converter hull manufacturing, advance the scaling-up of wave energy converter production,
and reduce costs. The funding received by CWEI will support the research and development of the
novel concrete material for wave energy converter hulls. The project aligns with Carnegie Clean
Energy’s commitment to innovation and the development of sustainable wave energy technologies.
CWEI’s participation in the project will enhance the understanding of alternative materials for future
deployments of CETO technology.
QUARTERLY REPORT | ISSUED 30 JANUARY 2024
4
TEAMER
Carnegie Clean Energy has secured support through the US Testing Expertise and Access to Marine
Energy Research (TEAMER) program. The company was selected as a Technical Support Recipient, and
the project has been granted $95,000 USD to facilitate a collaboration with the National Renewable
Energy Laboratory (NREL), a national laboratory of the US Department of Energy.
The joint effort harnesses the combined expertise of Carnegie and NREL in conducting advanced
computational fluid dynamics (CFD) modelling. Specifically, the project focuses on predicting accurate
loads associated with extreme wave events, a critical aspect for ensuring the survivability of wave
energy converters. The collaboration is expected to yield reliable load predictions for extreme wave
events, contributing to risk reduction in future CETO deployments.
This strategic partnership with NREL offers Carnegie an opportunity to leverage the extensive
modelling and testing expertise of the US Department of Energy’s national laboratory. This work is an
important part of Carnegie’s efforts to enhance the survivability of wave energy converters under
extreme conditions. CETO is built with survivability front of mind and this work will enhance its
resilience under the ocean’s more extreme conditions. With high confidence in the modelling of
extreme wave conditions, Carnegie can further optimise the technology and continue lowering the
levelised cost of energy produced.
OTHER PRODUCTS
MoTWEC
During the quarter, progress has been made on the Mooring Tensioner for Wave Energy Converters
(MoTWEC) project, which is backed by the Blue Economy CRC. The testing phase at Carnegie's onshore
testing facility has included crucial assessments of the Mooring Tensioner components, designed to
provide passive tension to the moorings of both CETO and MoorPower. After a period of maintenance,
the Mooring Tensioner prototype is ready to recommence testing and will resume cycles at Carnegie’s
research facility.
Supporting the ongoing development of the Mooring Tensioner technology, additional Mooring
Tensioner units have been successfully integrated into the Power Take-Off (PTO) unit recently
deployed as part of the MoorPower Demonstrator project.
With a combination of Mooring Tensioner testing undertaken onshore (on the test rig) and testing
undertaken offshore (as part of MoorPower), Carnegie will be gathering significant data and
experience relevant to the use of the Mooring Tensioner for both CETO and MoorPower.
EVENTS
During the quarter, CETO Wave Energy Ireland Project Manager, Miguel Santos Herrán, presented key
insights at the El foro sectorial de energía de las olas (The sectoral forum on energy of the waves)
hosted by the Basque Energy Cluster. Miguel discussed the progress towards the deployment of CETO
at BiMEP (BiMEP Biscay Marine Energy Platform) in the Basque Country. The presentation emphasised
advancements supported by the EuropeWave Project and RENMARINAS DEMOS Funding opportunity.
QUARTERLY REPORT | ISSUED 30 JANUARY 2024
5
The forum provided a valuable platform to share updates on the ACHIEVE Programme and contributed
to discussions on clean energy, wave energy, and the sustainable future of the energy sector.
ACHIEVE Project Manager Miguel Santos-Herran presenting at El foro sectorial de energía de las olas
FINANCIAL NOTES
At the end of the Quarter, Carnegie had approximately $2.35m in cash reserves. Careful management
of company funds and assets continues so that progress is made with highly efficient use of capital.
The Company remains debt free and in a solid position financially.
Note 6 to Appendix 4C:
Payments to related parties of the entity and their associates were made during the Quarter. In total,
approximately $75.3k was paid to Directors and associates for salaries, superannuation and
contracted services.
This announcement has been authorised by the Chairman and Company Secretary.
For more information
Carnegie Clean Energy Limited
+61 8 6168 8400
enquiries@carnegiece.com
www.carnegiece.com
QUARTERLY REPORT | ISSUED 30 JANUARY 2024
6
ABOUT CARNEGIE AND ITS SUBSIDIARIES
Carnegie Clean Energy (ASX: CCE) is a technology developer focused on delivering ocean energy
technologies to make the world more sustainable. Carnegie Technologies Spain and CETO Wave
Energy Ireland is a wholly owned subsidiary of Carnegie Clean Energy. Carnegie is the owner and
developer of the CETO® and MoorPower® technologies, which capture energy from ocean waves and
convert it into electricity. Using the latest advances in artificial intelligence and electric machines,
Carnegie can optimally control our technologies and generate electricity in the most efficient way
possible. The company has a long history in ocean energy with a track record of world leading
developments. https://www.carnegiece.com
ABOUT EUROPEWAVE PRE-COMMERCIAL PROCUREMENT PROGRAMME
EuropeWave PCP is an innovative R&D programme for wave
energy technology, which runs from 2022 to 2026. It will
combine over €22.5m of national, regional and EU funding to
drive a competitive Pre-Commercial Procurement (PCP)
programme for wave energy.
Originally pioneered by the Wave Energy Scotland programme, the PCP model provides a structured
approach, fostering greater openness, collaboration and sharing of risk between the public sector and
technology developers. The programme will focus on the design, development, and demonstration of
cost-effective wave energy converter (WEC) systems for electrical power production that can survive
in the harsh ocean environment.
Match-funded by the EU’s Horizon 2020 programme, it is a collaboration between Wave Energy
Scotland (WES), the Basque Energy Agency (EVE) and Ocean Energy Europe (OEE). This collaboration
is closely aligned with the decarbonisation, industrial and competitiveness objectives of the European
Green Deal, and is part of a range of actions being taken to meet the European Commission’s targets
of 100MW of ocean energy by 2025 and at least 1GW by 2030.
This is part of the EuropeWave project that has received funding from the European
Union’s Horizon 2020 Research and Innovation Programme under grant agreement
No 883751.
https://www.europewave.eu/
ABOUT RENMARINAS DEMOS
The RENMARINAS DEMOS Programme was established by Spain’s Ministerio para la Transición
Ecológica y el Reto Demográfico (Ministry for Ecological Transition and the Demographic Challenge)
to grant aid for investment in pilot projects, test platforms and port infrastructure for marine
renewables. This was established within the framework of the European Union-funded Recovery,
Transformation and Resilience Plan, Next Generation EU. The programme provides aid in the form of
a non-refundable grant managed by IDAE, Instituto para la Diversificación y Ahorro de la Energía
(Institute for Diversifcation and Energy Saving).
QUARTERLY REPORT | ISSUED 30 JANUARY 2024
7
ABOUT BLUE ECONOMY COOPERATIVE RESEARCH CENTER (CRC)
The Blue Economy Cooperative Research Centre (CRC) is established and supported under the
Australian Government’s CRC Program, grant number CRC-20180101. The CRC Program supports
industry-led collaborations between industry, researchers and the community. With a 10-year life, the
Blue Economy CRC brings together 44 industry, government, and research partners from ten countries
with expertise in aquaculture, marine renewable energy, maritime engineering, environmental
assessments and policy and regulation. Further information about the CRC Program is available at
www.business.gov.au.
QUARTERLY REPORT | ISSUED 30 JANUARY 2024
8
Rule 4.7B
Appendix 4C
Quarterly cash flow report for entities
subject to Listing Rule 4.7B
Name of entity
CARNEGIE CLEAN ENERGY LIMITED
ABN
Quarter ended (“current quarter”)
69 009 237 736
31 December 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(6 months)
$A’000
75
105
-
(2)
(d) leased assets
(24)
(47)
(e) staff costs
(649)
(1,247)
(f)
(316)
(524)
20
53
-
2,173
(894)
511
(30)
(201)
(6)
(10)
(223)
50
(a) research and development
(b) product manufacturing and operating
costs
(c) advertising and marketing
administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (Return of funds under deposit)
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) businesses
(c) property, plant and equipment
(d) investments
(e) intellectual property
(f)
other non-current assets
ASX Listing Rules Appendix 4C (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(6 months)
$A’000
Proceeds from disposal of:
(a) entities
(b) businesses
(c) property, plant and equipment
(d) investments
(e) intellectual property
(f)
other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (Net insurance less payments to
replace damage)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of
equity securities or convertible debt
securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
ASX Listing Rules Appendix 4C (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
(259)
(161)
-
-
Page 2
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
3,531
2,033
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(894)
511
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(259)
(161)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
4.5
Effect of movement in exchange rates on
cash held
(6)
(11)
4.6
Cash and cash equivalents at end of
period
2,372
2,372
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,472
2,331
5.2
Call deposits
900
1,200
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,372
3,531
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
Current quarter
$A'000
(79)
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 4C (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(894)
8.2
Cash and cash equivalents at quarter end (item 4.6)
2,372
8.3
Unused finance facilities available at quarter end (item 7.5)
8.4
Total available funding (item 8.2 + item 8.3)
8.5
Estimated quarters of funding available (item 8.4 divided by
item 8.1)
$A’000
2,372
2.7
Note: if the entity has reported positive net operating cash flows in item 1.9, answer item 8.5 as “N/A”. Otherwise, a
figure for the estimated quarters of funding available must be included in item 8.5.
8.6
If item 8.5 is less than 2 quarters, please provide answers to the following questions:
8.6.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
8.6.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
8.6.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
Note: where item 8.5 is less than 2 quarters, all of questions 8.6.1, 8.6.2 and 8.6.3 above must be answered.
ASX Listing Rules Appendix 4C (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies
which comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
30 January 2024
Authorised by: By Board of Directors
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been
prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the
corresponding equivalent standard applies to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 4C (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover